Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mastic Flooring Work (Mastic Work At Juction Point Block A And B Phase 2) Noida
|
| Description |
Mastic Flooring Work (Mastic Work At Juction Point Block A And B Phase 2) Noida
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_NOIDA_873321_1 |
|
Reference Number |
45/DGM/SM/WC-7/ET/2023-24 |
| Tender Fee | 5310 |
| EMD | 2.99 Lakh |
| Tender Value | - |
| Place | NOIDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 22, 2023 21:30 |
| End Date |
Expired
04/01/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Resurvey of albady block bit iii a & b reserved forest, with its boundary length measuring approximately 6.50 km in hebri range, kundapura division, during 2026-27.
Resurvey of albady block bit iii a & b reserved forest, with its boundary length measuring approximately 6.50 km in hebri range, kundapura division, during 2026-27.
Read moreRaising of monsoon plantation work under encroachment evicted forest area at kanur b no cxxxvi-6 fsno-209 (10ha), kanur fsno-241/a (10ha), mavinmane fsno-62 (10ha), (total 30ha) in idagundi range during 2026-27
Raising of monsoon plantation work under encroachment evicted forest area at kanur b no cxxxvi-6 fsno-209 (10ha), kanur fsno-241/a (10ha), mavinmane fsno-62 (10ha), (total 30ha) in idagundi range during 2026-27
Read moreMastic flooring work (mastic work at juction point block-a and b phase-ii) noida
Mastic flooring work (mastic work at juction point block-a and b phase-ii) noida
Read moreMastic flooring work (dbm, bc and mastic work from irrigation drain to india tv, sector-85) noida
Mastic flooring work (dbm, bc and mastic work from irrigation drain to india tv, sector-85) noida
Read moreStrengthening of road (resurfacing and mastic flooring work in sector-67) noida.
Strengthening of road (resurfacing and mastic flooring work in sector-67) noida.
Read moreStrengthening of road (construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-b hosiery complex) noida
Strengthening of road (construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-b hosiery complex) noida
Read moreMastic flooring work (providing and laying bituminous mastic work on sector-112, 113, 115, 117, 118 and 120 xing), noida
Mastic flooring work (providing and laying bituminous mastic work on sector-112, 113, 115, 117, 118 and 120 xing), noida
Read moreM/o road ( construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-a hosiery complex) noida
M/o road ( construction of rcc footpath, interlocking tile work and drain work at juction point along dsc road greenbelt block-a hosiery complex) noida
Read moreMastic flooring work (p/l mastic flooring and bc patch work on garhi gol chakkar and crossing at fng road in wc-4 area), noida.
Mastic flooring work (p/l mastic flooring and bc patch work on garhi gol chakkar and crossing at fng road in wc-4 area), noida.
Read moreMastic flooring work (p/l mastic flooring over crossing on 30.00m wide road and gate no.-1, 2, 3, 4 sector-69), noida.
Mastic flooring work (p/l mastic flooring over crossing on 30.00m wide road and gate no.-1, 2, 3, 4 sector-69), noida.
Read moreof your Industry type