Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of U.G. Hostel S.N. Medical College Agra
|
| Description |
Construction Of U.G. Hostel S.N. Medical College Agra
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPRNN_841567_1 |
|
Reference Number |
No.2013/GM/Agra Zone/Etender/RNN/23 Dt 21.09.23 |
| Tender Fee | 11800 |
| EMD | 46.4 Lakh |
| Tender Value | |
| Place | General Manager UPRNN Ltd. Agra Zone Agra |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 21, 2023 22:30 |
| End Date |
Expired
12/10/2023
Expired 1017 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Licensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.
Licensing of co-branding and inside advertising rights of nine no. metro 
 stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in 
 upmrc network.
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of p.g. hostel s.n. medical college agra
Construction of p.g. hostel s.n. medical college agra
Read moreConstruction of gymnasium building at s.n. medical college at district agra
Construction of gymnasium building at s.n. medical college at district agra
Read moreConstruction of gymnasium for m.b.b.s. students at s.n. medical college agra
Construction of gymnasium for m.b.b.s. students at s.n. medical college agra
Read moreConstruction of gymnasium for m.b.b.s. students at s.n. medical college agra
Construction of gymnasium for m.b.b.s. students at s.n. medical college agra
Read moreof your Industry type