Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Routing Of Pipeline Across Machchu River (Vbpl) By Hdd Technique And Hook Up With Existing Pipeline By Hot Tapping & Stoppling Including Product Ev
|
| Description |
Re Routing Of Pipeline Across Machchu River (Vbpl) By Hdd Technique
|
| Organisation | Bharat Petroleum Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_BPCL_17287 |
|
Reference Number |
1000421585 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://bpcltenders.eproc.in |
| Start Date | August 22, 2024 18:45 |
| End Date |
Expired
20/09/2024
Expired 757 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Read moreCarrying out hot tapping to hook up of hdd section
Carrying out hot tapping to hookup of hdd section at 04 locations ch. 19.940 km, ch. 70.089 km, ch. 77 km and ch. 101.50 km) in 18 in hbpl mainline section of phbpl and to make 18 in hbpl mainline and loopline independent by removing of t connection
Read moreReplacement of the valves by creating bypass through hot tapping double stoppling method at anklav tee point in trunk pipeline of cambay asset
Replacement of the valves by creating bypass through hot tapping double stoppling method at anklav tee point in trunk pipeline of cambay asset
Read morePwrjt23058/realignment and laying of new pipeline by hdd tie in and hook up with existing pipeline and associated works for replacement of suspended bridge crossing pipeline section across mahi river in kapl at ch 8.50 km under wrpl koyali jurisdtn
Pwrjt23058/realignment and laying of new pipeline by hdd tie in and hook up with existing pipeline and associated works for replacement of suspended bridge crossing pipeline section across mahi river in kapl at ch 8.50 km under wrpl koyali jurisdtn
Read moreRealignment of 30 inch od paradip haldia baruani crude oil pipeline across mahanadi river at ch. 13.500 km by installation of single length hdd, tie-in and hook-up with existing pipeline and associated work
Realignment of 30 inch od paradip haldia baruani crude oil pipeline across mahanadi river at ch. 13.500 km by installation of single length hdd, tie-in and hook-up with existing pipeline and associated work
Read moreSupply fabrication erection and laying of pipelines including hdd and hookup with existing and operational propane or butane ippl pipeline through hot tapping method near under-construction captive jetty of iocl at kamarajar port limited ennore chenn
Supply fabrication erection and laying of pipelines including hdd and hookup with existing and operational propane or butane ippl pipeline through hot tapping method near under-construction captive jetty of iocl at kamarajar port limited ennore chenn
Read moreCon of 14 in open cut submerged crossing of ctmpl across malattar river into 14 in hdd crossing by laying pipeline via horizontal directional drilling, hooking-up with existing ctmpl via hot tapping and other associated works
Con of 14 in open cut submerged crossing of ctmpl across malattar river into 14 in hdd crossing by laying pipeline via horizontal directional drilling, hooking-up with existing ctmpl via hot tapping and other associated works
Read moreLaying of mainline, hdd and other associated works for 18 inch kjppl and 12.75 inch beawar to lasariya section near beawar and 22 inch mppl near mohanpura (jaipur) for change of service of existing mundra-panipat pipeline from crude to product
Laying of mainline, hdd and other associated works for 18 inch kjppl and 12.75 inch beawar to lasariya section near beawar and 22 inch mppl near mohanpura (jaipur) for change of service of existing mundra-panipat pipeline from crude to product
Read moreof your Industry type