Tender Details

Particulars Details
Title
Granite Stone,Ceramic Glazed Wall Tiles,Masonry Brick Work,Modular Drawer Under The Slab,Metal Ceil
Description
Organisation Department of Consumer Affairs | Ministry of Consumer Affairs Food and Public Distribution
Tender Id GEM/2025/B/6302986
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date June 12, 2025 23:05
End Date
Expired 03/07/2025

Expired 468 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 10 Lakhs Experience with Gov. Required: Years
Buyer Name: Bishnujyoti Mishra
Ministry: Ministry Of Consumer Affairs Food And Public Distribution
Department: Department Of Consumer Affairs
Organisation: Bureau Of Indian Standards (bis)
Similar Tenders
Development of road under ward no. 18 of 7- ramnagar ac i ramthakur lane at durga chowmohani sh cc work, brick masonry work and precast slab etc

Development of road under ward no. 18 of 7- ramnagar ac i ramthakur lane at durga chowmohani sh cc work, brick masonry work and precast slab etc

Read more
Development of road under ward no. 18 of 7- ramnagar ac i ho anupam chakraborty to ho ratan roy, new boys club road sh cc work, carpeting work, brick masonry work and precast slab etc

Development of road under ward no. 18 of 7- ramnagar ac i ho anupam chakraborty to ho ratan roy, new boys club road sh cc work, carpeting work, brick masonry work and precast slab etc

Read more
Development of road under ward no. 18 of 7- ramnagar ac i ho jahar debbarma to ho nibedita roy opossite to ramnagar 3 road sh cc work, carpeting work, brick masonry work and precast slab etc

Development of road under ward no. 18 of 7- ramnagar ac i ho jahar debbarma to ho nibedita roy opossite to ramnagar 3 road sh cc work, carpeting work, brick masonry work and precast slab etc

Read more
Provn of toilet block at 60 coy asc/ncc dte , provn of iron grill/bars with bricks wks near parade grd of aoc cent and upgradation of slab in kitchen from kadapa stone to granite slab connected items in resi qtr at dgqa under br (s) iiof ge(s)secbad

Provn of toilet block at 60 coy asc/ncc dte , provn of iron grill/bars with bricks wks near parade grd of aoc cent and upgradation of slab in kitchen from kadapa stone to granite slab connected items in resi qtr at dgqa under br (s) iiof ge(s)secbad

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise