Tender Details

Particulars Details
Title
Estimate For Load Shifting Of Over Loaded132/33 Kv Ehv Substation To Under Loaded 220/33 Kv Ehv Substation Pipariya By Diverting 33 Kv Sohagpur Feeder From 132/33 Kv Ehv Substation Pipariya To 220/33 Kv Ehv Substation Pipariya Under O And M Dn
Description
Estimate For Load Shifting Of Over Loaded132/33 Kv Ehv Substation To Under Loaded 220/33 Kv Ehv Substation Pipariya By Diverting 33 Kv Sohagpur Feeder From 132/33 Kv Ehv Substation Pipariya To 220/33 Kv Ehv Substation Pipariya Under O And M Dn
Organisation Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT
Tender Id 2024_MKVVC_360521_1
Reference
Number
EE/STC/Works/2024-25/56 Date 29/7/2024
Tender Fee 2655
EMD 26700
Tender Value
Place Pipariya
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=424025
Start Date July 30, 2024 00:00
End Date

08/08/2024 ( Expired 304 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Read more
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal

Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 220 kv bhopal-bina line (about 997.510 mt) total 213 nos towers under ae tlm sub dn. vidisha under ee eht-m dn.bhopal

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur

Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur

Read more
Construction of 220/132 kv, 1x160 mva and 132/33 kv, 50 mva gss bhopa (dist - jaisalmer) alongwith 33kv, 5.43 mvar capacitor bank and associated bays on (turnkey project) against specification no. rvpn/ehv/bn-9019002504

Construction of 220/132 kv, 1x160 mva and 132/33 kv, 50 mva gss bhopa (dist - jaisalmer) alongwith 33kv, 5.43 mvar capacitor bank and associated bays on (turnkey project) against specification no. rvpn/ehv/bn-9019002504

Read more
Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl

Supplying laying and spreading of crushed stone over a layer of cement,sand,and brick khoa mix and other associated works at lv side portion switchyard of 3rd 31.5 mva transformer at new bishnupur 220 kv substation under bankura area office,wbsetcl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise