Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hlb At Km 33/0 2 On Vemanapally To Penchikalpet Road In Kumrambheem Asifabad District.
|
| Description |
Construction Of Hlb At Km 33/0 2 On Vemanapally To Penchikalpet Road In Kumrambheem Asifabad District.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_800638_1 |
|
Reference Number |
NIT No.SE RBCircleMNCL CRF01 2023-24, dt 13032024 |
| Tender Fee | 11800 |
| EMD | 13.74 Lakh |
| Tender Value | |
| Place | Telangana |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841617 |
| Start Date | March 14, 2024 23:30 |
| End Date |
Expired
21/03/2024
Expired 808 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages on kufri chail road km 0/000 to 25/000
Removal of slips at various 0/000 to 25/00
Read moreConstruction of approach road and protection work on bisuhi river of gosaiganj-bheti-mahrua-dostpur road (main district road) at km-13 under katehari assembly in district ambedkar nagar on sbd mode.
Construction of approach road and protection work on bisuhi river of gosaiganj-bheti-mahrua-dostpur road (main district road) at km-13 under katehari assembly in district ambedkar nagar on sbd mode.
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreConstruction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Construction of atal pragati path sh-75 to nuwaliya km 0/0 to 1/250.
Read moreImprovement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 )of old nh31
Improvement of road stretches on nh_17 from coronation bridge (km 595.20 of old nh_31) to manpong (km 597.00 of old n.h.31) in the district of kalimpong, west bengal.
Read moreConstruction of 1.mohjhari to chikhlamali road length 1.80 km 2. matkatola to wara road length 1.80 km
Construction of 1.mohjhari to chikhlamali road length 1.80 km&#x0d 2. matkatola to wara road length 1.80 km
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConstruction of 1.sihari to dighori road length 3.00 km 2. kalimati thanegaon road length 3.00 km
Construction of 1.sihari to dighori road length 3.00 km&#x0d 2. kalimati thanegaon road length 3.00 km
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreAnti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur
Read moreof your Industry type