Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Controlled Condition Growth Chamber Facility For Sugarcane
|
| Description |
|
| Organisation | Department of Agricultural Research and Education (DARE) | Ministry of Agriculture and Farmers Welfare |
| Tender Id | GEM/2023/B/4207081 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | November 14, 2023 16:54 |
| End Date |
Expired
15/12/2023
Expired 986 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Re-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Re-advertisement for request for proposal for consultancy services for preparation of detailed project report (dpr) and transaction advisor (ta) for buxar – bhagalpur six-lane greenfield access-controlled expressway
Read moreProcurment and intallation of items for providing internet connection facility
Procurment and intallation of items for providing internet connection facility
Read moreRunning of guest house mess facility for a period of 02 (two) years at karnatak university, dharwad
Running of guest house mess facility for a period of 02 (two) years at karnatak university, dharwad
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. providing services for operation of water testing laboratory and allied works related to quality of water at wtp ranjangaon for two years alongwith providing, erecting and co
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. providing services for operation of water testing laboratory and allied works related to quality of water at wtp ranjangaon for two years alongwith providing, erecting and co
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreof your Industry type