Tender Details
Particulars | Details |
---|---|
Title |
Sitc Of New Control Cum Protection Panel For Hv Side Of 66 By 11 Kv 2 Mva Transformers No. 01 And 02 Along With Dismantling Of Existing Old Panel At Matatila Hydro Power Plant Distt Lalitpur
|
Description |
Sitc Of New Control Cum Protection Panel For Hv Side Of 66 By 11 Kv 2 Mva Transformers No. 01 And 02 Along With Dismantling Of Existing Old Panel At Matatila Hydro Power Plant Distt Lalitpur
|
Organisation | Uttar Pradesh Jal Vidyut Nigam Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1770 |
EMD | 30000 |
Tender Value | |
Place | Office of Executive Engineer EGD Matatila Power h |
Link |
AAAAAAAAAA Login to view |
Start Date | April 08, 2025 21:30 |
End Date |
09/05/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreReplacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreSupply and fixing of 03 nos. air blower and accessories along with cleaning of duct from mouth of blower to avr floor, turbine floor and pump floor at matatila hydro power station, distt. lalitpur
Supply and fixing of 03 nos. air blower and accessories along with cleaning of duct from mouth of blower to avr floor, turbine floor and pump floor at matatila hydro power station, distt. lalitpur
Read moreAugmentation of 20mva, 66/11kv power transformers with 31.5 mva, 66/11kv power transformers along with 11kv switch gear panel board and associated civil works at various 220kv sub stations in delhi transco limited on turnkey basis
Augmentation of 20mva, 66/11kv power transformers with 31.5 mva, 66/11kv power transformers along with 11kv switch gear panel board and associated civil works at various 220kv sub stations in delhi transco limited on turnkey basis
Read moreDi of existing water supply pipe line from glsr to kk-3 filter bed (passing through solar power plant at kk-5 old agent office), by laying 250 mm dia hdpe line along the road, mandamarri area, mancherial dist.
Di of existing water supply pipe line from glsr to kk-3 filter bed (passing through solar power plant at kk-5 old agent office), by laying 250 mm dia hdpe line along the road, mandamarri area, mancherial dist.
Read moreTender notice for supply, installation, testing and commissioning (sitc) of 02 nos. 11/0.433 kv 1000 kva transformers, 01 no. 11kv 800amps 26.3ka ht vcb panel (1ic 2og) and ht/lt cabling works at state bank of india, local head office lucknow (u.p.),
Tender notice for supply, installation, testing and commissioning (sitc) of 02 nos. 11/0.433 kv 1000 kva transformers, 01 no. 11kv 800amps 26.3ka ht vcb panel (1ic 2og) and ht/lt cabling works at state bank of india, local head office lucknow (u.p.),
Read moreSupply erection, testing and commissioning of new control cum protection panel for hv side of 66 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt- lalitpur.
Supply erection, testing and commissioning of new control cum protection panel for hv side of 66 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt- lalitpur.
Read moreComplete rectification of faults of crompton make 66kv 11kv 2mva 1st transformer at matatila hydro power plant dist. lalitpur
Complete rectification of faults of crompton make 66kv 11kv 2mva 1st transformer at matatila hydro power plant dist. lalitpur
Read moreDrawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch rotary type and dismantling of pole at jagannathpur ocp for a period of 02 year
Drawing of temporary 3.3kv ht over head line on as and when required basis for providing power to pumps, lighting transformers, etc along with fitting of 11kv ab switch rotary type and dismantling of pole at jagannathpur ocp for a period of 02 year
Read moreDm and sditc of hydraulic power pack including heat exchanger and electrical control panel for operation of caisson, as replacement of existing machine by dismantling of old one, including 5 years cmc after expiry of 2 years dlp at lock entrance
Dm and sditc of hydraulic power pack including heat exchanger and electrical control panel for operation of caisson, as replacement of existing machine by dismantling of old one, including 5 years cmc after expiry of 2 years dlp at lock entrance
Read moreof your Industry type