Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Signaling Work In Connection With Through Rail Renewal (P) 72.240 Tkm At Durg Nagpur Section Of Nagpur Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73841754 |
|
Reference Number |
ST-TRR-72-240Tkm-Dur-N-24 |
| Tender Fee | 0 |
| EMD | 2.44 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73841754/viewNitPdf_4493838.pdf |
| Start Date | February 28, 2024 22:32 |
| End Date |
Expired
26/03/2024
Expired 936 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
1. maksi - dewas - trr(p) - 11.709 tkm 2. indore-dewas-ujjain section- through rail renewal (p) total 4.354tkm & 3. indore - dewas - ujjain section - tfr - 36.973 tkm
Read moreComplete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read moreExecution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Execution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Read more1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a
1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a
Read moreOpen e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Read moreThrough sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Through sleeper renewal (p) by agency s track laying (pqrs/sqrs/qrs/tle) portal and material (except rail) complete at purulia jn. - chandil jn. - tsr(p) (dn)- 20.281 tkm., purulia jn. - chandil jn. - tsr(p) ( up) - 16.289 tkm, kharagpur - bhadrak (up & dn) - tsr(p) - 49.619 tkm, (kgp & adra division) total tsr(p) =86.189 tkm. in ser
Read more(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
Read moreS&t works in connection with slgr-mrht & fkg-mxn (sl) - tsr (p) -28.800 tkm & 17.200 tkm respectively
S&t works in connection with slgr-mrht & fkg-mxn (sl) - tsr (p) -28.800 tkm & 17.200 tkm respectively
Read moreA)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
Read moreSignaling work in connection with alteration in existing hitachi make ei in connection with provision of modification of points circuits ndkr1/rdkr1 and kavach ready interface of nagpur, pune, bhusawal and mumbai division.
Signaling work in connection with alteration in existing hitachi make ei in connection with provision of modification of points circuits ndkr1/rdkr1 and kavach ready interface of nagpur, pune, bhusawal and mumbai division.
Read moreof your Industry type