Tender Details

Particulars Details
Title
Providing Labour Assistance For Clearing Of Jammed Coal ,Wet Coal, Slurry Coal Removed From Crushers, Vibrating Screens Belt Feeder Chutes , Clearing Of Heavily Accumulated Coal Heaps ,Slurry Coal On All The Floors Of Crusher House For Early Restoration Of Various Equipment In Operation For Uninterrupted Supply Of Coal Feeding To Bunkers During Rainy Season For The Year 2025 26
Description
Providing Labour Assistance For Clearing Of Jammed Coal ,Wet Coal, Slurry Coal Removed From Crushers, Vibrating Screens Belt Feeder Chutes , Clearing Of Heavily Accumulated Coal Heaps ,Slurry Coal On All The Floors Of Crusher House For Early Restoration Of Various Equipment In Operation For Uninterrupted Supply Of Coal Feeding To Bunkers During Rainy Season For The Year 2025 26
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 835712
Reference
Number
E-15/25-26 of CE/OM/Dr.NTTPS(SE/OM/CHP)
Tender Fee 336
EMD 4800
Tender Value -
Place AP
Link
View Original Tender Notice

https://tender.apeprocurement.gov.in

Start Date August 19, 2025 22:30
End Date
Expired 22/08/2025

Expired 402 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Clearing of jammed wet coal from service bunkers in old co complex.

Clearing of jammed wet coal from service bunkers in old co complex.

Read more
Cutting and clearing of slurry jammed in the existing drain to avoid spread of slurry water to wash coal stock yard under chp cpp, piparwar area.

Cutting and clearing of slurry jammed in the existing drain to avoid spread of slurry water to wash coal stock yard under chp cpp, piparwar area.

Read more
Clearing of badly jammed bunker no. a2,a5,a6, b4 and b6 of raw coal bunker jammed with foreign materials coal and slurry of main plant of kedla washery.

Clearing of badly jammed bunker no. a2,a5,a6, b4 and b6 of raw coal bunker jammed with foreign materials coal and slurry of main plant of kedla washery.

Read more
Cleaning of spillage/ overflown/jammed coal, slush, slurry etc. around various belt conveyors of new chp phase i, kusmunda project.

Cleaning of spillage/ overflown/jammed coal, slush, slurry etc. around various belt conveyors of new chp phase i, kusmunda project.

Read more
Cleaning of coal/malma/debris /slurry from loading point of coal tippers below the surface bunkers for proper loading of coal into tippers from bunkers for smooth dispatch of coal from jhiria ug mine.

Cleaning of coal/malma/debris /slurry from loading point of coal tippers below the surface bunkers for proper loading of coal into tippers from bunkers for smooth dispatch of coal from jhiria ug mine.

Read more
Providing labor assistance for emergency coal clearing like slurry coal, jammed coal and wet coal in m-1(conveyors)/chp(m.m)- ii/dr.nttps during night shifts whenever required in rainy season during the year 2025-2026.

Providing labor assistance for emergency coal clearing like slurry coal, jammed coal and wet coal in m-1(conveyors)/chp(m.m)- ii/dr.nttps during night shifts whenever required in rainy season during the year 2025-2026.

Read more
Assistance in day-to-day minor maintenance/ welding works in all three shifts at all running feeder breakers, secondary crushers, associated belt conveyors, steel bunkers etc. at mini chp and any other location for a period of one year at dep.

Assistance in day-to-day minor maintenance/ welding works in all three shifts at all running feeder breakers, secondary crushers, associated belt conveyors, steel bunkers etc. at mini chp and any other location for a period of one year at dep.

Read more
Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.

Regular cleaning of spillage coal dust/slush/slurry etc including feeder breakers,associated secondary crushers and belt conveyors,steel bunkers etc of all running feeder breaker circuit at mini chp for a period of 180days at dipka expansion project.

Read more
Removal and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abcp mine of block - ii area

Removal and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abcp mine of block - ii area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise