Tender Details

About Tender

πŸš† Mmrda Seeks Comprehensive Bids For Line 5 Rolling Stock πŸš‡πŸ”§ The Mumbai Metropolitan Region Development Authority (Mmrda), A State Government Entity, Invites Bids For The Design, Manufacture, Supply, Installation, Integration, Testing, And Commissioning Of Rolling Stock For Line 5 Of The Mumbai Metro, Encompassing Both Phase 1 And Phase 2. This Includes The Provision Of Communication Based Train Control (Cbtc) Telecommunication Systems, Power Substations (Psd), And Depot M & P. πŸ“… Bid Submission Deadline: July 9, 2024, 3:00 Pm πŸ’° Tender Fee: Inr 11,800 πŸ’² Emd: Inr 1 Crore (10 Million) Interested Bidders Must Possess The Requisite Expertise And Experience In Delivering Such Complex Projects. The Scope Also Includes Maintenance For 15 Years Post Commissioning, Followed By 2 Years Of Defect Liability Maintenance Period (Dlmp). Keywords: Mmrda, Mumbai Metro, Line 5, Rolling Stock, Cbtc, Telecommunication, Power Substations, Depot M & P, Maintenance, Tender, Bid, Emd, Cmc, Dlmp
Particulars Details
Title
Design Manufacture Supply Installation Integration Testing And Commissioning Of Rolling Stock Cbtc Telecommunication Psd And Depot M And P Of Line 5 Phase 1 And Phase 2 Of Mmrda Including 15 Years Of Cmc Plus 2 Years Of Dlmp
Description
Design Manufacture Supply Installation Integration Testing And Commissioning Of Rolling Stock Cbtc Telecommunication Psd And Depot M And P Of Line 5 Phase 1 And Phase 2 Of Mmrda Including 15 Years Of Cmc Plus 2 Years Of Dlmp
Organisation Mumbai Metropolitan Region Development Authority | State Govt. and UT
Tender Id 2024_MMRDA_1015127_1
Reference
Number
CA 241
Tender Fee 11800
EMD 10 Lakh
Tender Value
Place MUMBAI
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1775993
Start Date February 26, 2024 20:30
End Date

09/07/2024 ( Expired 362 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Read more
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati

Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)

Read more
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.

Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Survey design fabrication supply installation testing and commissioning of total 15.00 kw of on grid connected rooftop solar pvpower plant including comprehensive maintenence contract (cmc) for 5 years

Survey design fabrication supply&amp#x0d installation testing and commissioning of total&amp#x0d 15.00 kw of on grid connected rooftop&amp#x0d solar pvpower plantincluding comprehensive&amp#x0d maintenance contract (cmc) for 5 years &amp#x0d

Read more
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years

Read more
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years

Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years

Read more
Design manufacture supply erection testing and commissioning including warrantee and amc for 5 years of 25 kw grid connected and 05 kw off grid

Design manufacture supply erection testing net metering and commissioning including warrantee and amc for 5 years of 25 kw grid connected rooftop pv power plant and 05 kw off grid solar power plant.

Read more
Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.

Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.

Read more
Survey, design, fabrication, supply, installation, testing and commissioning of total 70.11 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 3 years

Survey, design, fabrication, supply, installation, testing and commissioning of total 70.11 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 3 years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise