Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
For The Work For Erection Of Line For New Connection On Jhatpat Portal, Nives Mitra And Shifting Under Ee, Uedd Ii, Varanasi.
|
Description |
For The Work For Erection Of Line For New Connection On Jhatpat Portal, Nives Mitra And Shifting Under Ee, Uedd Ii, Varanasi.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_PVVNV_844505_1 |
Reference Number |
110/UEDC-I(V)/2023-24 |
Tender Fee | 2360 |
EMD | 13000 |
Tender Value | 0 |
Place | VARANASI |
Link | https://etender.up.nic.in |
Start Date | September 29, 2023 23:30 |
End Date |
05/10/2023 ( Expired 618 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreProviding gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Providing gang for the work of attending to resolving the fuse off call complaints lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle pspcl mohali on per day basis
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreWork of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Work of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Read moreof your Industry type