Tender Details
Particulars | Details |
---|---|
Title |
Restoration And Rejuvenation Of Yamuna Flood Plain Nizamuddin Bridge To Dnd Flyway Western Bank
|
Description |
Development Work At Nh 24 Area Near Baansera, Sarai Kale Khan.
|
Organisation | Delhi Development Authority | Central Govt. Ministry/Department |
Tender Id | 2024_DDA_813286_1 |
Reference Number |
20/EE/HCD-9/DDA/2024-25 |
Tender Fee | 0 |
EMD | 1.87 Lakh |
Tender Value | |
Place | As per tender Document |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=854693 |
Start Date | June 25, 2024 00:25 |
End Date |
01/07/2024 ( Expired 324 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreConst. of separate bridge structure parallel to existing bridges for di of various diameters of water mains in h-k wards of western suburbs -separate bridge on vakola nalla near maharashtra nagar, valmiki nagar, bandra e in h east ward.
Const. of separate&#x0d bridge structure parallel to&#x0d existing bridges for di of various diameters of water mains in h-k wards of western suburbs -separate&#x0d bridge on vakola nalla near&#x0d maharashtra nagar, valmiki&#x0d nagar, bandra e in h&#x0d east ward.
Read moreO and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreConstruction of h.l bridge 66.36 m long over patiala ki rao nadi crossing khudda lahora karoran road to stp, naya gaon including its approaches and retaining wall in distt. s.a.s. nagar.
Construction of h.l bridge 66.36 m long over patiala ki rao nadi crossing khudda lahora karoran road to stp, naya gaon including its approaches and retaining wall in distt. s.a.s. nagar.
Read moreM and r to protect left bank at amlighat area from erosion of river killing for the year 2024-2025
M and r to protect left bank at amlighat area from erosion of river killing for the year 2024-2025
Read moreof your Industry type