Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Dedicated Distribution Line For 5 Nos. Of Pwss Of Majuli Phe Div Under Sopd G
|
| Description |
Work For Installation Of Dedicated Distribution Line For 5 Nos. Of Piped Water Supply Schemes Of Majuli Phe Division Under The Programme Sopd G
|
| Organisation | Public Health Engineering Department | State Govt. and UT |
| Tender Id | 2024_PHED_39073_1 |
|
Reference Number |
PHE_09_MM_PB_24_25_T_5797_803 |
| Tender Fee | 2000 |
| EMD | 2.18 Lakh |
| Tender Value | - |
| Place | MAJULI |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=63315 |
| Start Date | September 19, 2024 15:30 |
| End Date |
Expired
15/10/2024
Expired 730 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kwa dedicated feeder from etumanoor s/s to poovathumood
Kwa dedicated feeder from ettumanoor s/s to poovathumood under electrical section ayarkunnam
Read moreProviding of pick-up vehicles (tata / mahindra etc. ) for transportation of damaged machinery/ electro-mechanical equipments etc. from different pumping stations to workshops in jammu and samba of phe mech. sub div samba-ii of phe samba
Please refer boq
Read moreImprovement of matanguri rd. from 2nd gate to indo bhutan border (11.00 kms) under sopd-g-ve during the fy 2026-27.
Improvement of matanguri rd. from 2nd gate to indo bhutan border (11.00 kms) under sopd-g-ve during the fy 2026-27.
Read moreImprovement of patrolling path from kanchanbari tiniali to uchila beat (5.50 kms) under sopd-g-v-be during the fy 2026-27
Improvement of patrolling path from kanchanbari tiniali to uchila beat (5.50 kms) under sopd-g-v-be during the fy 2026-27
Read moreImprovement of mathanguri road from 2nd gate to indo bhutan border (10.50 kms) under sopd-g-v-be during the fy 2026-27.
Improvement of mathanguri road from 2nd gate to indo bhutan border (10.50 kms) under sopd-g-v-be during the fy 2026-27.
Read moreImprovement of patrolling path from uchila beat to katajhar beat via- mainao camp (6.20 kms) under sopd-g-v-be during the fy 2026-27.
Improvement of patrolling path from uchila beat to katajhar beat via- mainao camp (6.20 kms) under sopd-g-v-be during the fy 2026-27.
Read moreConstruction of cc block road from st. john church to kabirali deor connecting under sopd-g btc for the finanicial year 2024-25. package no. tn_47_4
Construction of cc block road from st. john church to kabirali deor connecting under sopd-g btc for the finanicial year 2024-25. package no. tn_47_4
Read moreImprovement of patrolling path from new camp to kuchiabeel camp with 3 (three) nos. slab culvert (1.40 km) under sopd-g-v-be during the fy 2026-27.
Improvement of patrolling path from new camp to kuchiabeel camp with 3 (three) nos. slab culvert (1.40 km) under sopd-g-v-be during the fy 2026-27.
Read moreSupply, installation, testing and commissioning for creation of 2x1mva substation and laying of dedicated 11kv feeder from lungmar substation for pm e- bus sewa at new bus stand on full turnkey basis for the financial year 2026-27
Same as above
Read moreImp. of patrolling path from kahibari camp to bhumuk via kuribeel with 4 (four) nos. slab culverts (4.20 kms) under sopd-g-v-be during the fy 2026-27.
Imp. of patrolling path from kahibari camp to bhumuk via kuribeel with 4 (four) nos. slab culverts (4.20 kms) under sopd-g-v-be during the fy 2026-27.
Read moreof your Industry type