Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Pcc For Pedestal,Providing,Mxng And Plcng,Rcc,1 Is To 2 Is To 4 Mix,Structural Steel,Excavation In E
|
Description |
|
Organisation | NA | Ministry of Petroleum and Natural Gas |
Tender Id | GEM/2025/B/5815727 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 14, 2025 18:19 |
End Date |
28/01/2025 ( Expired 137 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreAAAAAAAAAA
Login to viewRfp for consultancy services for preparation of dpr and providing pre-construction services in respect to up gradation of existing 2l to 4l plus ps agartala to udaipur section of nh-08 and udaipur to amarpur
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreOne time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreof your Industry type