Tender Details

Particulars Details
Title
Installation Of Faecal Sludge And Septage Treatment Plant Of 30 Kld Capacity Based On Enhanced Digestion And Multi Stage Bioreactor
Description
Installation Of Faecal Sludge And Septage Treatment Plant Of 30 Kld Capacity Based On Enhanced Digestion And Multi Stage Bioreactor Edmsb At Kalna I Block Within District Of Purba Bardhaman Under Sbmg Fund.
Organisation Government of West Bengal
Tender Id 2023_ZPHD_581714_1
Reference
Number
DE-E-NIT-57 of 23-24
Tender Fee 0
EMD 4.5 Lakh
Tender Value
Place Purba Bardhaman Zilla Parishad
Link https://wbtenders.gov.in
Start Date September 30, 2023 14:30
End Date

30/10/2023 ( Expired 600 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.

Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.

Read more
Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode

Establishment of 3 mld desalination plant based on sea water reverse osmosis at v.o.chidambaranar port and operation and maintenance for 5 years on dbo mode

Read more
Epcom of 160 tpd 80 tpd mixed and 80 tpd source segregated municipal solid waste based compressed biogas cbg plant for commercial use at agartala, tripura on domestic competitive bidding basis

Epcom of 160 tpd 80 tpd mixed and 80 tpd source segregated municipal solid waste based compressed biogas cbg plant for commercial use at agartala, tripura on domestic competitive bidding basis

Read more
Installation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia

Installation of faecal sludge and treatment plant of 10 kld capacity based on bio digester aided constructed wetland (bac) technology at karimpur-ii block, nadia

Read more
Installation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia

Installation of faecal sludge and treatment plant of 6 kld capacity based on bio digester aided constructed wetland (bac) technology at nabadwip block, nadia

Read more
General housekeeping cleaning and reclamation of spilled coal etc from all locations of coal handling plant as per scope of work on stage 1 and 2 of 2 x 210 mw and 2 x 250 mw ghtp lehra mohabat

General housekeeping cleaning and reclamation of spilled coal etc from all locations of coal handling plant as per scope of work on stage 1 and 2 of 2 x 210 mw and 2 x 250 mw ghtp lehra mohabat

Read more
Construction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5 years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of paschim bardhaman

Construction and installation of advanced fstp of 6 kld capacity based on bac fstp on a dbot model with 5&amp#x0d years operation and maintenance (oandm) at gopalpur g.p under kanksa development block in the district of&amp#x0d paschim bardhaman

Read more
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia

Read more
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme

Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme

Read more
Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps

Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise