Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Filling Of Cracks And Depression With Fiber Based Crack Fillers And Bigger Cracks And Depression Wi
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4748547 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 08, 2024 02:19 |
| End Date |
Expired
18/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | Allishan Collections | - | 16-03-2024 15:44:51 | MII | Qualified |
| 2 | MEHRAS SPORTS AND FITNESS | - | 16-03-2024 15:13:34 | MII | Qualified |
| 3 | ORIENTAL SPORTS | - | 15-03-2024 13:51:55 | MII | Qualified |
| 4 | RIYANSH AND CO | - | 16-03-2024 15:48:27 | MII MSE | Qualified |
| 5 | SK SALES | - | 16-03-2024 17:08:22 | MII MSE | Qualified |
| 6 | STURDY INTERNATIONAL | - | 18-03-2024 08:41:47 | MII MSE | Qualified |
| 7 | TLK SPORTS INFRA | - | 15-03-2024 14:06:21 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | TLK SPORTS INFRA(MII) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 98499.00 | L1 |
| 2 | ORIENTAL SPORTS (MII) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 104678.00 | L2 |
| 3 | Allishan Collections (MII) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 107075.00 | L3 |
| 4 | MEHRAS SPORTS AND FITNESS (MII) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 109510.00 | L4 |
| 5 | STURDY INTERNATIONAL (MSE,MII)( MSE Social Category:OBC ) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 134000.00 | L5 |
| 6 | RIYANSH AND CO (MSE,MII)( MSE Social Category:General ) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 159250.00 | L6 |
| 7 | SK SALES (MSE,MII)( MSE Social Category:General ) | Item Categories : Filling of Cracks and Depression with Fiber Based Crack Fillers and Bigger Cracks and Depression wi | 174550.00 | L7 |
S/r to dashapalla- bhanjanagar road (sh-37) from 8/100km to 13/300 km in stretches for 2026-27 (such as providing bm for depression filling and sdbc as wearing course in stretches)
S/r to dashapalla- bhanjanagar road (sh-37) from 8/100km to 13/300 km in stretches for 2026-27 (such as providing bm for depression filling and sdbc as wearing course in stretches)
Read moreProviding and executing wall painting including surface preparation, scraping, crack filling, one coat exterior primer, two coats premium exterior acrylic emulsion paint, artwork, lettering, logo, slogan, complete as per approved design,
Providing and executing wall painting including surface preparation, scraping, crack filling, one coat exterior primer, two coats premium exterior acrylic emulsion paint, artwork, lettering, logo, slogan, complete as per approved design,
Read moreBullet camera 1.3 mp,wi fi device,nvr 08 channel,ups,d link rj 45,dlink cat 6 utp cable,rj 6 power cable,ofc 02 core fiber cable,2m cat 6 cable,1m cat 6 cable,15 amp power socket,skilled manpower for installation and repair
Bullet camera 1.3 mp,wi fi device,nvr 08 channel,ups,d link rj 45,dlink cat 6 utp cable,rj 6 power cable,ofc 02 core fiber cable,2m cat 6 cable,1m cat 6 cable,15 amp power socket,skilled manpower for installation and repair
Read morePillow for second and third ac coaches conforming to the specification described below: i) min. size 24 inches (61 cms) x 16 inches (40.6 cms) ii) min. height of pillow in center: 6.7 inches (17cms). iii) filling material: hollow siliconized polyester fiber of 7 denier (min) or hollow siliconized conjugated polyester fiber of 7 denier (min) iv) min. weight of filling material 550 gms. v) total min. weight of pillow 600 gms. vi) body fabric: cloth plain weave polyester cotton (65-67: 35-33) whi
Pillow for second and third ac coaches conforming to the specification described below: i) min. size 24 inches (61 cms) x 16 inches (40.6 cms) ii) min. height of pillow in center: 6.7 inches (17cms). iii) filling material: hollow siliconized polyester fiber of 7 denier (min) or hollow siliconized conjugated polyester fiber of 7 denier (min) iv) min. weight of filling material 550 gms. v) total min. weight of pillow 600 gms. vi) body fabric: cloth plain weave polyester cotton (65-67: 35-33) whi
Read moreSite preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Read moreSingle line cordless phone,rojet box,handwash anticeptic,lable printer,ribbon for lable printer,dusting cloth,optical fiber lc to sc,optical fiber fc to fc,digital multimeter 9a,aaa rechargeable cell,aaa normal cell,m88 (1 1) telephone instrument,bty 12 volt, 150 ahc,hdmi cable 4k uhd (15 mtr),hdmi cable 4k uhd (25 mtr),handheld wired microphone,hdmi splitter 4k (1 in 2),hdmi splitter 4k (1 in 4),optical to ethernet converter (20km),rgbic strip (5mtr),interface cable for phone patch rti 2050,wi-fi router,surface light,power strip (04xport),air cooling device,electronic voltage stabilizer 1. amp
Single line cordless phone,rojet box,handwash anticeptic,lable printer,ribbon for lable printer,dusting cloth,optical fiber lc to sc,optical fiber fc to fc,digital multimeter 9a,aaa rechargeable cell,aaa normal cell,m88 (1 1) telephone instrument,bty 12 volt, 150 ahc,hdmi cable 4k uhd (15 mtr),hdmi cable 4k uhd (25 mtr),handheld wired microphone,hdmi splitter 4k (1 in 2),hdmi splitter 4k (1 in 4),optical to ethernet converter (20km),rgbic strip (5mtr),interface cable for phone patch rti 2050,wi-fi router,surface light,power strip (04xport),air cooling device,electronic voltage stabilizer 1. amp
Read moreFirewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Firewall,logging and analytics,storage,core switch,distribution switch main,sfp 10g,sfp 25g,qsfp 40g,distribution switch h hostel,access switch poe,wi-fi 7 access point,wlan controller,sfp 10g,qsfp 40g,utp patch cord 0.5 mtr,utp patch cord 2 mtr,io face plate,patch panel,cat 6 utp cable,fiber cable,25 mm pvc casing capping conduit,rack 12u,rack 9 u,liu 6 port,liu 24 port,fiber patch cord,ups,network management and monitoring,50x50 mm pvc trunking,laying of utp cable,io face plate,ofc cable laying,cat6 patch panel installation,fiber splicing,rack installation and dressing,access point installation charges,network device installation testing and commissioning,01 manpower for service and support 3 years,03 year support, operation and maintenance
Read moreSite preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing
Read moreof your Industry type