Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Poh Kit Complete For Vertical Dampers Of M/S. Gabriel India Ltd. /Pune Make (Capacity 300kg) Etc.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106206168 |
|
Reference Number |
20233013B |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/012024/106206168/viewNitPdf_4410243.pdf |
| Start Date | November 27, 2023 03:16 |
| End Date |
Expired
08/01/2024
Expired 1010 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spec.no.035/26-27, dt.05.10.2026, 11 kv single pole vertical type gos ab switch complete set
11 kv single pole vertical type gos ab switch complete set
Read moreShell & tube evaporator, vertical mounting type for 3 ton capacity oil chiller unit, 6 inch dia x 30
Shell & tube evaporator, vertical mounting type for 3 ton capacity oil chiller unit, 6 inch dia x 30
Read moreSupply, installation, testing and commissioning of rotating assembly for 2 nos. 51.84 mld capacity vertical sewage pump-sets at new globe mill pumping station
Supply, installation, testing and commissioning of rotating assembly for 2 nos. 51.84 mld capacity vertical sewage pump-sets at new globe mill pumping station
Read moreSupply and maintenance of 9 m bus d plus 35 (2x2) battery capacity (kw hr)-200 fast charging ccs2 - (3rd call)
Supply and maintenance of 9 m bus d plus 35 (2x2) battery capacity (kw hr)-200 fast charging ccs2 - (3rd call)
Read more757/p-3/emp-13345 dt. 25.09.2026 for overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Overhauling of boiler auxiliaries like id fans, fd fans and their auxiliaries, ducting, dampers and gates for 01 unit of 210 mw bhel make units of 4x210 mw capacity at ggsstp, ropar
Read moreProcurement of self propelled fully mobile tyre mounted hydraulic mobile crane (hydra) of 12 ton capacity complete with standard accessories, tools and documentation and hydra crane 20 ton capacity(pick and carry type)
Procurement of self propelled fully mobile tyre mounted hydraulic mobile crane (hydra) of 12 ton capacity complete with standard accessories, tools and documentation and hydra crane 20 ton capacity(pick andcarry type)
Read moreRequest for proposal for appointment of nodal consultant cum financial consultant or transaction adviser for construction of high capacity mass transit route hcmtr inner ring road construction of twin tunnel or double decker twin tunnel underground
Request for proposal for appointment of nodal consultant cum financial consultant or transaction adviser for construction of high capacity mass transit route hcmtr inner ring road construction of twin tunnel or double decker twin tunnel underground
Read moreSelection of laboratories for testing of products/material - soil soil testing complete all as specified computation of bearing capacity for buildings meters/nos civil
Selection of laboratories for testing of products/material - soil soil testing complete all as specified computation of bearing capacity for buildings meters/nos civil
Read moreSelection of laboratories for testing of products/material - soil soil testing complete all as per specified computation of bearing capacity for buildings meter/number civil
Selection of laboratories for testing of products/material - soil soil testing complete all as per specified computation of bearing capacity for buildings meter/number civil
Read moreOperation of tmcs 250 mld capacity water supply scheme from pise head works, wtp temghar, mbr upto majiwade junction pipeline etc. complete for the period of three years.
Operation of tmcs 250 mld capacity water supply scheme from pise head works, wtp temghar, mbr upto majiwade junction pipeline etc. complete for the period of three years.
Read moreof your Industry type