Tender Details
Particulars | Details |
---|---|
Title |
30 Hp Rotor Motor Fully Assembled, Part. No: M400 400 For Murzello Shot Blasting Machine.
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 20:46 |
End Date |
28/05/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
1. gasket, o-ring, material-e.p.d.m, process water jacket, part no.715 suitable for can motor pump
Read more
Portable car washer machine veh,400 psi cwdc pump with 3 hp 1 phase cg motor,welding machine 275 am
Read more
Plunger (part no. 6) for hp dosing pump (model pl-3530),suction side/discharge side valve assembly
Read more
Work for rewinding of 02 nos electric motor of capacity 325 hp for pump house no 5 loharu canal.
Work for rewinding of 02 nos electric motor of capacity 325 hp for pump house no 5 loharu canal.
Read moreValve seat poly m2r part no. 02-1120-20-400 spare for wilden/dover make aodd pump model p2/pkppp/vt
Read more
Job required for repair to old burnt serviceable motor of capacity 60 hp no 2 kabul line pump house, 75 hp no 1 at cav hills area pump house and repair to centrifugal pump no 3 of model dsm 100 36 in the area of age (u) water supply no ii under g
Job required for repair to old burnt serviceable motor of capacity 60 hp no 2 kabul line pump house, 75 hp no 1 at cav hills area pump house and repair to centrifugal pump no 3 of model dsm 100 36 in the area of age (u) water supply no ii under g
Read moreInstallation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Installation of 01 no. 5 hp open well pump with all accessories, erection of pipeline and round o clock operation and maintenance of pump motor set for a period of 75 days at bazari more under s.b. project.
Read moreof your Industry type