Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Testing And Commissioning Of 20 Kva Ups, 3 Phase Input 3 Phase Output Online Ups With Battery System For Minimum 30 Minutes Of Backup Time At Ksum Incubation Space, Basement 2 Floor, Thejaswini Building
|
| Description |
Supply Installation Testing And Commissioning Of 20 Kva Ups, 3 Phase Input 3 Phase Output Online Ups With Battery System For Minimum 30 Minutes Of Backup Time At Ksum Incubation Space, Basement 2 Floor, Thejaswini Building, Technopark, Trivandrum
|
| Organisation | Government of Kerala |
| Tender Id | 2023_T TBI_580517_1 |
|
Reference Number |
KSUM/TVM/20KVAUPS/E-T/06/23-24 |
| Tender Fee | 1400 |
| EMD | 17500 |
| Tender Value | - |
| Place | Kerala Startup Mission, TVM |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | June 12, 2023 18:30 |
| End Date |
Expired
22/06/2023
Expired 1210 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work
Provn of 35 kva generator set and replacement of 82.5 kva dg set qty 02 and provn of two 100 kva three phase online ups with 45 minutes backup time and 160 kva transformer and connected work
Read moreUps 1kva with 30 minutes back up through maint. free battery (n6130-004366),ups-5kav with ext. batteries for 02 hours back up iso certifi (n6130-004367),ups 2kva online with smf battery, 2hrs backup (n7440-p030946)
Ups 1kva with 30 minutes back up through maint. free battery (n6130-004366),ups-5kav with ext. batteries for 02 hours back up iso certifi (n6130-004367),ups 2kva online with smf battery, 2hrs backup (n7440-p030946)
Read moreDesktop computer with ms windows 11 professional,projector system,projector screen 500 inch motorised,fire alarm system,ups 5kva online with 16 x 12v 26ah bty,interactive podium,access control biometric system dual factor,mob jammer system,cctv system alongwith accessories,visualizer,utp cable cat 6 305 mtr,hdmi splitter 4 input 4 output,hdmi 2.1 matrix switcher 8x8 multiviewer,hdmi switcher 4 input 4 output
Desktop computer with ms windows 11 professional,projector system,projector screen 500 inch motorised,fire alarm system,ups 5kva online with 16 x 12v 26ah bty,interactive podium,access control biometric system dual factor,mob jammer system,cctv system alongwith accessories,visualizer,utp cable cat 6 305 mtr,hdmi splitter 4 input 4 output,hdmi 2.1 matrix switcher 8x8 multiviewer,hdmi switcher 4 input 4 output
Read morePunching tool for rj45 socket with cat 5 cable,growler heavy duty for six cylinder sel engine,screw driver set of 5 pieces 100 to 300 mm,auto transformer 3 phase input 230 v, output, 0 to 270 v.,solid state solar base single phase energy meter bidirectional 5 to 30amops,240v,magnetic flux meter 0 to 500 tesla,foot print grip 250 mm,earth electrode primary electrode 2100x28x3.25mm,bus bar with brackets 1 mtr,automatic reverse forward starter 3phase 440v,soft starter single phase,immersion heater 1500 watt, 240v,dmx controller 512,rewinding machine manual,table for demonstration 2.5 x 1.20 x 0.75 meters
Punching tool for rj45 socket with cat 5 cable,growler heavy duty for six cylinder sel engine,screw driver set of 5 pieces 100 to 300 mm,auto transformer 3 phase input 230 v, output, 0 to 270 v.,solid state solar base single phase energy meter bidirectional 5 to 30amops,240v,magnetic flux meter 0 to 500 tesla,foot print grip 250 mm,earth electrode primary electrode 2100x28x3.25mm,bus bar with brackets 1 mtr,automatic reverse forward starter 3phase 440v,soft starter single phase,immersion heater 1500 watt, 240v,dmx controller 512,rewinding machine manual,table for demonstration 2.5 x 1.20 x 0.75 meters
Read moreSupply installation testing and commissioning of 20 kva ups, 3 phase input 3-phase output online ups with battery system for minimum 30 minutes of backup time at ksum incubation space, basement 2 floor, thejaswini building
Supply installation testing and commissioning of 20 kva ups, 3 phase input 3-phase output online ups with battery system for minimum 30 minutes of backup time at ksum incubation space, basement 2 floor, thejaswini building
Read moreof your Industry type