Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Public Taps With Real Time Quality Monitoring System In Dharamshala
|
| Description |
Installation Of Public Taps With Real Time Quality Monitoring System In Dharamshala
|
| Organisation | Government of Himachal Pradesh |
| Tender Id | 2023_DSCL1_79274_1 |
|
Reference Number |
DSCL/Public Taps-211/2023-24-2146 |
| Tender Fee | 10000 |
| EMD | 2.07 Lakh |
| Tender Value | - |
| Place | Old HIMUDA building, Cheelgadi, Distt. Kangra, H P |
| Link |
View Original Tender Notice
https://hptenders.gov.in |
| Start Date | September 23, 2023 23:30 |
| End Date |
Expired
10/10/2023
Expired 1098 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Read moreComprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreSupply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreProviding electrifical wiring, flooring repairs, ceiling repairss, water facilities and taps in kitchen white washing/painting etc., to tgtwurjc (b) echoda (v) of echoda (m) of adilabad district
Providing electrifical wiring, flooring repairs, ceiling repairss, water facilities and taps in kitchen white washing/painting etc., to tgtwurjc (b) echoda (v) of echoda (m) of adilabad district
Read moreSupply, installation and commissioning of vibration monitoring system (vms) for generating unit at pjhes (revulapally(v), jogulamba gadwal (dist.))
Supply, installation and commissioning of vibration monitoring system (vms) for generating unit at pjhes (revulapally(v), jogulamba gadwal (dist.))
Read moreSingle-tender for up gradation of gas monitoring system along with amc for three years at indane bottling plant etawah
Please refer tender document
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreConstruction of a pcc road and rcc drain in ward no. 17 of bettiah municipal corporation, spanning from hazarimal dharamshala to trimurti chowk and from lal bazar chowk to teen laltain chowk.
Construction of a pcc road and rcc drain in ward no. 17 of bettiah municipal corporation, spanning from hazarimal dharamshala to trimurti chowk and from lal bazar chowk to teen laltain chowk.
Read moreProcurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area
Procurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area
Read moreof your Industry type