🚂 Invitation For Bids: Electrical Substation Construction At Medchal Railway Station 🏭🔧 The Ministry Of Railways, Under The Central Government, Invites Bids For The Proposed Construction Of An Electrical Substation Building At Medchal Railway Station, Secunderabad. 🛣️ 📅 Bid Submission Deadline: May 10, 2024, 3:00 Pm A Tender Fee Of Inr 66800 Has Been Set For The Earnest Money Deposit (Emd). Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Tender Documents. Keywords: Electrical Substation, Construction, Railway Station, Medchal, Ministry Of Railways, Gati Shakti, Government Tender, Central Govt. Ministry/Department| Particulars | Details |
|---|---|
| Title |
Hyderabad Division: Gati Shakti: Proposed Construction Of Electrical Substation Building At Medchal Railway Station.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74497747 |
|
Reference Number |
7_GS_HYB_24_OT |
| Tender Fee | 0 |
| EMD | 66800 |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74497747/viewNitPdf_4529451.pdf |
| Start Date | April 17, 2024 21:02 |
| End Date |
Expired
10/05/2024
Expired 884 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Read moreErection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works
Erection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works
Read moreDc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Read moreSupply of material/equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) 132/11kv sub-station at nellikal, (ii) 132kv lilo to proposed 132/11kv nellikal lis substation from the existing 132kv sc line from 220/132/11kv nagarjuna sagar receiving station to 132kv nagarjuna sagar left canal ss (1.5km) near nellikal(v), thirumalgiri-sagar mandal of nalgonda district on turnkey basis.
Supply of material/equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) 132/11kv sub-station at nellikal, (ii) 132kv lilo to proposed 132/11kv nellikal lis substation from the existing 132kv sc line from 220/132/11kv nagarjuna sagar receiving station to 132kv nagarjuna sagar left canal ss (1.5km) near nellikal(v), thirumalgiri-sagar mandal of nalgonda district on turnkey basis.
Read moreProviding of 3rd alternate source to 33/11kv film nagar indoor ss by laying of 4.9km of 33kv 3x400sq.mm xlpe ug cable (single run) from 33/11kv sandhya ss to 33/11kv film nagar ss (utilizing one cable of triple run cable proposed from 132/33kv manikonda eht ss pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d imp
Providing of 3rd alternate source to 33/11kv film nagar indoor ss by laying of 4.9km of 33kv 3x400sq.mm xlpe ug cable (single run) from 33/11kv sandhya ss to 33/11kv film nagar ss (utilizing one cable of triple run cable proposed from 132/33kv manikonda eht ss pertaining to kalyan nagar lines section and sub division of banjarahills lines division of scada circle and work executed by the master plan sd-iv section and sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works (reserved for st category).
Read moreHyderabad division: gati shakti: hiring of gc (general consultants) for technical support/assistance in gati shakti unit of hyderabad division.
For complete deion and other details, please refer to tender
Read moreHyderabad division: gati shakti: improvements to facade at medchal, malkajgiri, malakpet, yakutpura, huppuguda, umdanagar and mahboobnagar stations under amrit bharath station scheme.
For complete deion and other details, please refer to tender
Read moreHyderabad division - gati shakti: ohe modifications for proposed construction of 12 mtrs wide fobs at shadnagar (shnr), jadcherla (jcl), medchal (med), dharmabad (dab) & gadwal (gwd) (5 nos. stations) - electrical trd arrangements.
For complete deion and other details, please refer to tender
Read moreHyderabad division: gati shakti:- proposed construction of 12.00 m wide fob and provision of escalators and lifts at gadwal (gwd), jedcherla (jcl), shadnagar (shnr), medchal (med) & dharmabad (dab) under south central railway - major up gradation of stations on indian railways (phase-iii)- electrical arrangements.
For complete deion and other details, please refer to tender
Read moreConstruction of gati shakti vishwavidyalaya
For complete deion and other details, please refer to tender
Read moreof your Industry type