Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Review Of Isometric Drawings Along With Stress Analysis Of New Piping And Review Of Design Drawings Of Civil Foundation For Erection And Commissioning Of New Bfw Pump Unit In Ammonia Plant
|
| Description |
Review Of Isometric Drawings Along With Stress Analysis Of New Piping And Review Of Design Drawings Of Civil Foundation For Erection And Commissioning Of New Bfw Pump Unit In Ammonia Plant
|
| Organisation | Department of Fertilisers | Central Govt. Ministry/Department |
| Tender Id | 2023_MCF_738612_1 |
|
Reference Number |
NFL/PT/MECH/L/23/804 |
| Tender Fee | 750 |
| EMD | 50000 |
| Tender Value | |
| Place | NFL PANIPAT |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1041549 |
| Start Date | December 20, 2023 17:00 |
| End Date |
Expired
24/01/2024
Expired 886 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Design, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreEoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Eoi document for selection of consortium partner for design supply installation testing commissioning and operation maintenance of atms projects in zone1 delhi region on epc mode
Read moreSupply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreFlexibility/ stress analysis and piping support design of various piping modifications in ammonia-ii plant
Flexibility/ stress analysis and piping support design of various piping modifications in ammonia-ii plant
Read moreConstruction of foundation and other allied civil works for erection and commissioning of new bfw pump at nfl panipat
Construction of foundation and other allied civil works for erection and commissioning of new bfw pump at nfl panipat
Read moreConstruction of foundation and other allied civil works for erection and commissioning of new bfw pump at nfl panipat
Construction of foundation and other allied civil works for erection and commissioning of new bfw pump at nfl panipat
Read moreof your Industry type