Tender Details

Particulars Details
Title
Replacement Of 1200mm Conveyor Belt Of F/B No. Iii Kessurgarh Abocp Mine
Description
Replacement Of 1200mm Conveyor Belt Of F/B No. Iii Kessurgarh Abocp Mine
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_342110_1
Reference
Number
GM/B-II/AM (ENM)/E-TENDER/2025-26/077 dt 18.08.25
Tender Fee 0
EMD 1000
Tender Value -
Place ABOCP Mine, Block-II Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=354626

Start Date August 23, 2025 14:30
End Date
Expired 02/09/2025

Expired 404 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana

Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana

Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.

Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.

Read more
Replacement of existing sewer line with 250mm dia swg main line from h.no.19-121/1 to 19-121/3b gowtham nagar street no.12 under gowtham nagar section, sd-iii, o and m div.no.xiii.

Replacement of existing sewer line with 250mm dia swg main line from h.no.19-121/1 to 19-121/3b gowtham nagar street no.12 under gowtham nagar section, sd-iii, o and m div.no.xiii.

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise