Tender Details

Particulars Details
Title
Providing Of 01 Kw Ndl Connection Aagandwadi Under Vidisha (R) Dc (06 No Work)
Description
Providing Of 01 Kw Ndl Connection Aagandwadi Under Vidisha (R) Dc (06 No Work)
Organisation Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT
Tender Id 2024_MKVVC_332411_1
Reference
Number
DY/GM/STC/ 4379/02 dt 12.02.2024
Tender Fee 495
EMD 3089
Tender Value -
Place Aagandwadi under Vidisha (R) DC
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=390222

Start Date February 12, 2024 23:30
End Date
Expired 19/02/2024

Expired 968 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of dc fast charer - 240 kw,inst & comm of dc fast charer - 240 kw,camc_ 240 kw fast charger

Supply of dc fast charer - 240 kw,inst & comm of dc fast charer - 240 kw,camc_ 240 kw fast charger

Read more
2.5 kw igbt-based 3-phase 4-leg converter,dc motor with slip-ring induction generator (mechanical setup)

2.5 kw igbt-based 3-phase 4-leg converter,dc motor with slip-ring induction generator (mechanical setup)

Read more
Dc motor 450 kw and 3 phase slipring motor hp 400 with startor and acb on rent basis

Dc motor 450 kw and 3 phase slipring motor hp 400 with startor and acb on rent basis

Read more
Base to drg no f-1301-054920 h dc 35044-a dated 06-03-91

Base to drg no f-1301-054920 h dc 35044-a dated 06-03-91

Read more
Tn-19073 for procurement and retrofitting of existing l and t make 4p dc drive panel for the 150 kw apron feeder dc motor installed at wt5, at chp , kstps, kota

Procurement and retrofitting of existing l and t make 4p dc drive panel for the 150 kw apron feeder dc motor installed at wt5, at chp , kstps, kota

Read more
Construction of a meter room for releasing an electricity connection of 3287 kw load to ensure smooth power supply to major dhyan chand state sports university salawa, meerut.

Construction of a meter room for releasing an electricity connection of 3287 kw load to ensure smooth power supply to major dhyan chand state sports university salawa, meerut.

Read more
176.01.034_gasket,176.02.495_gasket,176.02.203.1_gasket,175.03.037_gasket,172.03.105_gasket,172.11.094-432.40.089.1-gasket,tu-005-6016-80-46-3-hose-40u40-7-bore-dia-48mm-wall-thickness-3.0mm,cqa-hv-5.31.020_hose-connection,cqa-hv-5.31.028_hose-connection,176.31.019_gasket,520.06.002.03_gasket-14x20-alluminium,432.31.104.2_gasket,175.31.085sb_partition,tu-005-280-76-hose-2t20-15-bore-dia-20mm-wall-thickness-4.5mm,172.32.552_gasket,4720720537842_hose-connection-cqa-hv-5-32-037,cqa-hv-5.32.000_hose-connection,cqa-hv-5.32.014_hose-connection,cqa-hv-5.32.054_hose-connection,5330023176_gasket-173-32-304,cqa-hv-5.32.049_hose-connection,cqa-hv-5.32.016_hose-connection,520-06-001-09-1_gasket-36x42,4720720537841_hose-connection-cqa-hv-5-32-045,2262a.17_ring-packing-17.5x2.5,432.91.282.1_gasket,520.06.002_gasket-8x14-alluminium,5330381619_gasket-171-40-102,432.40.090.1-432.40.093-gasket,432.40.103_ring-packing,432.42.022_ring-packing,175.51.016.1_ring-packing,175.51.017.1_ring-packing,cqa-hv-6.51.001_seal-and-spring-set

176.01.034_gasket,176.02.495_gasket,176.02.203.1_gasket,175.03.037_gasket,172.03.105_gasket,172.11.094-432.40.089.1-gasket,tu-005-6016-80-46-3-hose-40u40-7-bore-dia-48mm-wall-thickness-3.0mm,cqa-hv-5.31.020_hose-connection,cqa-hv-5.31.028_hose-connection,176.31.019_gasket,520.06.002.03_gasket-14x20-alluminium,432.31.104.2_gasket,175.31.085sb_partition,tu-005-280-76-hose-2t20-15-bore-dia-20mm-wall-thickness-4.5mm,172.32.552_gasket,4720720537842_hose-connection-cqa-hv-5-32-037,cqa-hv-5.32.000_hose-connection,cqa-hv-5.32.014_hose-connection,cqa-hv-5.32.054_hose-connection,5330023176_gasket-173-32-304,cqa-hv-5.32.049_hose-connection,cqa-hv-5.32.016_hose-connection,520-06-001-09-1_gasket-36x42,4720720537841_hose-connection-cqa-hv-5-32-045,2262a.17_ring-packing-17.5x2.5,432.91.282.1_gasket,520.06.002_gasket-8x14-alluminium,5330381619_gasket-171-40-102,432.40.090.1-432.40.093-gasket,432.40.103_ring-packing,432.42.022_ring-packing,175.51.016.1_ring-packing,175.51.017.1_ring-packing,cqa-hv-6.51.001_seal-and-spring-set

Read more
Provn of 2 x split ac 1.5 ton with stabilizer at along mil stn and 06 x toilet and 06 x bathroom near each bldg no owt-39, owt-44, owt-47, water pipeline connection for existing geyser, covered shed for pathway, 250 sqm hard standing at borarupak m

Provn of 2 x split ac 1.5 ton with stabilizer at along mil stn and 06 x toilet and 06 x bathroom near each bldg no owt-39, owt-44, owt-47, water pipeline connection for existing geyser, covered shed for pathway, 250 sqm hard standing

Read more
Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa

Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa

Read more
Project 50 plus 50 plus 60 plus 15 kw on rts power plant for structured dismantling uninstallation of solar panel, dc and ac cable safe unloading and stocking of all materials at lal school and gora bazar school cantt. jabalpur, ridge bazar school an

Project 50 plus 50 plus 60 plus 15 kw on rts power plant for structured dismantling uninstallation of solar panel, dc and ac cable safe unloading and stocking of all materials at lal school and gora bazar school cantt. jabalpur, ridge bazar school an

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise