Tender Details
Particulars | Details |
---|---|
Title |
Detuning Andot Peening Of Lpt Last Stage Blades Lp 3 L And F 250 Mw Kwu Units Of Bongaigaon Thermal Plant
|
Description |
Detuning Andot Peening Of Lpt Last Stage Blades Lp 3 L And F 250 Mw Kwu Units Of Bongaigaon Thermal Plant
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_92023_1 |
Reference Number |
NTPC/USSC-CPG3/9900292082 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bongaigaon Thermal Power Project |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=95222 |
Start Date | November 13, 2024 16:30 |
End Date |
20/11/2024 ( Expired 186 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read morePeriodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months
Periodical and round the clock maintenance job of 4 x 12.75 mw tg sets and associated electromechanical installations within power house, 132 kv substation, forebay, intake and tailrace at rhp, stage ii for 24 months
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreDesign engineering procurement supply construction and commissioning of cumulative 7.5 mw grid connecter solar power plant with 5 years comprehensive maintenance
Design engineering procurement supply construction and commissioning of cumulative 7.5 mw grid connecter solar power plant with 5 years comprehensive maintenance
Read moreSpl repair to bldg no t-8 and t-29 (recreation hall) of 54 coy asc (sup) and provn of ro plant system near bldg no p-116 ph-i (opd complex) of mh and certain mw works in the area of age b/r-ii under ge (west) jabalpur
Spl repair to bldg no t-8 and t-29 (recreation hall) of 54 coy asc (sup) and provn of ro plant system near bldg no p-116 ph-i (opd complex) of mh and certain mw works in the area of age b/r-ii under ge (west) jabalpur
Read moreRepairing and maintenance of plant road from service building stage-ii at ntpc barh
Repairing and maintenance of plant road from service building stage-iito chp mgr area (phase-i) at ntpc barh
Read more2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
2x600 mw shree singaji tpp, khandwa- work of annual cleaning of drains, roads and other area in plant, sstpp (stage-i and stage-ii), khandwa.
Read moreTn-5398 operation and maintenance of portable ac ,water cooler and refrigerators of plant stage i to v and chp, offices and colony area at kstps, kota
Operation and maintenance of portable ac ,water cooler and refrigerators of plant stage i to v and chp, offices and colony area at kstps, kota
Read moreOverhauling of lp/hp co2 booster compressors and drive turbine train of urea plant at nfl, bathinda unit
Overhauling of lp/hp co2 booster compressors and drive turbine train of urea plant at nfl, bathinda unit
Read moreof your Industry type