Tender Details

Particulars Details
Title
Pvip Removing Obstructions From Canal And Various Nets Of Edappally Branch Canal During Water Distribution Period 2023 24
Description
Civil Works
Organisation Government of Kerala
Tender Id 2023_Irrig_595139_2
Reference
Number
IRR/PII/TR/438/2023_5_4_3/1
Tender Fee 1235
EMD 13981
Tender Value -
Place PVIP Sub division No. 4, Aluva
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date August 11, 2023 23:30
End Date
Expired 23/08/2023

Expired 1147 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Read more
Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.

Estimate for interlinking of 33kv uttaraspally feeder and 33kv kv chowderguda feeder for providing of alternate power suplly to thummalapally ss, veerannapet and chowderguda ss during break downs and other maintainance works in kondurg section in shadanagar sub division in shadnagar division in rajendranagar circle under summer action plan.

Read more
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Pvip- removing obstructions from canals and various nets edappally branch canal during water distribution period 2024-25

Removing the plastic waste,floting waste and&amp#x0d other accumulating waste near the bridge&amp#x0d abutments, nets, shutters etc. through out water&amp#x0d distribution.

Read more
Pvip-2024-25- removing obstructions during water distribution from canals,syphons and aqueducts of aluva branch canal and sbcs mds.

Removing the plastic waste, floating waste,&amp#x0d accumulating near the bridge abutments, net,&amp#x0d shutters etc. in aluva branch canal and its&amp#x0d sbcs and mds through out water&amp#x0d distribution.

Read more
Engaging labour for removing obstructions during water distribution for main canal 1/1

General-cpp-tms-action plan-(2025-&amp#x0d 26)-engaging labour for removing&amp#x0d obstructions during water distribution for main&amp#x0d canal and all its branches and distributory&amp#x0d canals under section 1/1.-general civil work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise