Tender Details
Particulars | Details |
---|---|
Title |
Kiifb Kiifb Augmentation Of Wss To Karumalloor And Kunnukara Panchayaths Augmentation Of Wss To Karumallur And Kunnukara Panchayaths Phase I Package Ii
|
Description |
Construction Of 20 Mld Wtp And Allied Works At Malayikkunnu In Kunnukara Panchayath Ohsr Of Capacity 8 50 Ll At Malayikkunnu Wtp Compound And Supply And Erection Of Pump Sets General Civil
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_613092_1 |
Reference Number |
E-Tender No 159/2023-24/SE/PHC/CHN |
Tender Fee | 19518 |
EMD | 5 Lakh |
Tender Value | |
Place | Kerala Water Authority, P.H Circle, Kochi-11 |
Link | https://etenders.kerala.gov.in |
Start Date | October 13, 2023 22:45 |
End Date |
27/10/2023 ( Expired 566 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDemolition and reconstruction of certain omqs at af stn halwara (phase-i)
Demolition and reconstruction of certain omqs at af stn halwara (phase-i)
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreof your Industry type