Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Complete Repairing By Change Of Worm Wheel And Worm Shaft For Redicon Make Gear Box Type U 1000 Of Moonidih Project, W.J.Area. Sl.No.Cws/1000/01
|
Description |
Complete Repairing By 
Change Of Worm Wheel And 
Worm Shaft For Redicon 
Make Gear Box Type U 1000 
Of Moonidih Project, 
W.J.Area. 
Sl.No.Cws/1000/01
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_325760_1 |
Reference Number |
BCCL/WJA/AM(ENM)/24-25/RP-103 |
Tender Fee | 0 |
EMD | 1680 |
Tender Value | |
Place | Moonidih Project, WJ Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337667 |
Start Date | January 15, 2025 15:30 |
End Date |
28/01/2025 ( Expired 156 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of soot blowing worm reduction gear box( speed reducer) for 27vi 72(t) 74air preheater of unit-12 boilers
Procurement of soot blowing worm reduction gear box( speed reducer) for 27vi 72(t) 74air preheater of unit-1 and 2 boilers
Read moreA)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
A)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
Read moreComplete repairing/rewinding of different types and different capacity of induction motors, volt-415, 3phase (a)55 kw, rpm-985, si no. 546359, make-russian, (b)18.5 kw, rpm-985, si no. wnp (u no.250), make-indian, (c)(03 nos.) 11kw, rpm-975, si no. i
Complete repairing/rewinding of different types and different capacity of induction motors, volt-415, 3phase (a)55 kw, rpm-985, si no. 546359, make-russian, (b)18.5 kw, rpm-985, si no. wnp (u no.250), make-indian, (c)(03 nos.) 11kw, rpm-975, si no. i
Read moreWork of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Work of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Read moreRepairing of 06 nos. radicon make gear box u-600 at kurja ug mine of kurja sub area.
Repairing of 06 nos. radicon make gear box u-600 at kurja ug mine of kurja sub area.
Read moreComplete repairing/rewinding of 30 h.p. 440v, 3 phase induction motor sl. no. enm/jwtp/01 and star delta er panel use for blower at jwtp under block-ii area
Complete repairing/rewinding of 30 h.p. 440v, 3 phase induction motor sl. no. enm/jwtp/01 and star delta er panel use for blower at jwtp under block-ii area
Read moreComplete repairing and fitting of 75hp, 600gpm kirloskar make pump set, sl. no. wtp/75hp/01 for domestic water supply at bilbera water treatment plant under govindpur
Complete repairing and fitting of 75hp, 600gpm kirloskar make pump set, sl. no. wtp/75hp/01 for domestic water supply at bilbera water treatment plant under govindpur
Read more(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreRepairing of complete engine, gear box, fuel pump, brake system and steering system of ace 12t crane sl.no. mc-554 of gidi-a project.
Repairing of complete engine, gear box, fuel pump, brake system and steering system of ace 12t crane sl.no. mc-554 of gidi-a project.
Read moreof your Industry type