Tender Details

Particulars Details
Title
General Construction Of New Building For Snm Govt Lp School Kottuvallikkad Soil Investigation Work
Description
The Provisions Included In The Estimate&Amp#X0d Are Clearing Jungle Including Uprooting Of Rank&Amp#X0d V E G E T A T I O N , M O B I L I Z A T I O N I N C L U D I N G&Amp#X0d Transportation, Setting Up Boring, Boring With&Amp#X0d Rotary Power Drilling Equipment &Amp#X0d
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_747685_1
Reference
Number
PWD/BLDG/TR/95003/2021_5_1/2
Tender Fee 745
EMD 8451
Tender Value -
Place Aluva
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1208220

Start Date March 07, 2025 22:30
End Date
Expired 17/03/2025

Expired 574 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.

Supply of filter elements for lp bypass hpsu and lp bypass actuator filters in tm divisions of units-i and ii of stage-i/ytps.

Read more
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Read more
Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps

Supply of lp turbine lead diaphragms for unit-3,4 of tm division/stage-ii/btps

Read more
Procurement of diaphragm rupture gasket and disc which are installed in lp turbines and tdbfp at stpp, jaipur, mancherial, telangana

Procurement of diaphragm rupture gasket and disc which are installed in lp turbines and tdbfp at stpp, jaipur, mancherial, telangana

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Construction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.

Construction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.

Read more
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise