Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Additional 100 Bedded Hospital Block (Phase Ii) In The Campus Of Lnjp Hospital Kurukshetra (Pdg. Mgp And Allied Work ).
|
Description |
Construction Of Additional 100 Bedded Hospital Block (Phase Ii) In The Campus Of Lnjp Hospital Kurukshetra (Pdg. Mgp And Allied Work ).
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16180 |
EMD | 9.6 Lakh |
Tender Value | |
Place | Ambala Cantt |
Link |
AAAAAAAAAA Login to view |
Start Date | June 07, 2025 15:30 |
End Date |
16/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreDevelopment of residential towers and community center including allied work at 37 d, green view apartments, gurugram on design, engineering, procurement and construction (epc) basis including operation and maintenance of 5 years
Development of residential towers and community 
 center including allied work at 37 d, green view 
 apartments, gurugram on design, engineering, 
 procurement and construction (epc) basis including 
 operation and maintenance of 5 years
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreDesign, engineering and procurement for construction of remaining work 300 bedded obs and gynae block(include 100 bedded pediatric block) upums saifai etawah on epc mode(1)
Design, engineering and procurement for construction of remaining work 300 bedded obs and gynae block(include 100 bedded pediatric block) upums saifai etawah on epc mode(1)
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreof your Industry type