Tender Details

Particulars Details
Title
Resurfacing Of Roads In Hwp (K) Plant Site Phase Iv
Description
Resurfacing Of Roads In Hwp (K) Plant Site Phase Iv
Organisation Heavy Water Board | Central Govt. Ministry/Department
Tender Id 2024_HWB_826891_1
Reference
Number
HWPK/CIVIL/2024/120
Tender Fee 0
EMD 1.43 Lakh
Tender Value
Place HWPK Plant Site
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=868926
Start Date September 26, 2024 15:30
End Date

07/10/2024 ( Expired 251 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu

Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 9 gummidipoondi, tiruttani, sholinghur, jolarpettai, maduranthagam, thirukazhukundram

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu package 9

Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 1 punjai puliyampatti, bhavanisagar, sathyamangalam, bhavani

Read more
Repair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki

Repair/resurfacing of road, road furniture, road marking, rcc bollard etc and sign board at tb-ii and dunkirk line under age b/r-ii in ge (c) khadki

Read more
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1

Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1

Read more
Package-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp

Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun

Read more
Removal of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025

Removal of evaporator e221 a and b shell old cladding with patches and to reinstall new cladding already rolled in urea plant during tar 2025

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise