Tender Details

Particulars Details
Title
State Plan State Plan 2021 22 Rehabilitation Improvement Work Of Wss Wss To Irinjalakuda Municipality And Muriyad And Elookkara Panchayaths In Thrissur District Package I Part C
Description
Construction Of 22 Ll Ohsr And 350mm Di K9 Cwpm Construction Of 22 Ll Capacity Ohsr And 350mm Di K9 Cwpm. General Civil Work
Organisation Kerala Water Authority | State Govt. and UT
Tender Id 2024_KWA_685463_1
Reference
Number
RT-42/SE/PHC/TSR/2024-25
Tender Fee 11800
EMD 2 Lakh
Tender Value
Place Irinjalakuda
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1066640
Start Date August 13, 2024 21:30
End Date

24/08/2024 ( Expired 299 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Geometric improvement and restoration work of syari cooperative to ranipool alternate highway under gangtok district, sikkim (8.70 km).

Geometric improvement and restoration work&amp#x0d of syari cooperative to ranipool alternate&amp#x0d highway under gangtok district, sikkim (8.70&amp#x0d km).

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Work of strengthening of road, laying of interlocking tiles and repair of drains and lighting of road from house number 485-8 to house number c-497 to house number c-522 via c-381 in prahladpuri scheme, hardoi.

Work of strengthening of road, laying of interlocking tiles and repair of drains and lighting of road from house number 485-8 to house number c-497 to house number c-522 via c-381 in prahladpuri scheme, hardoi.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise