Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Concrete Cover Drain With Soakpit Under Gwm Management From Dilip Ghosh House To High Road At Galsi Sansad Xvi Id 111672239
|
Description |
Construction Of Concrete Cover Drain With Soakpit Under Gwm Management From Dilip Ghosh House To High Road At Galsi Sansad Xvi Id 111672239
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 4500 |
Tender Value | |
Place | GALSI XVI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 21:00 |
End Date |
23/05/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreof your Industry type