Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Engagement Of Additional 450&Amp#X0d
Nos. Of Mazdoor For Eid Ud Zoha&Amp#X0d
From 07.06.2025 To 09.06.2025&Amp#X0d
Under Borough Ix.
|
Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4700 |
Tender Value | |
Place | BOROUGH-IX |
Link |
AAAAAAAAAA Login to view |
Start Date | May 20, 2025 19:30 |
End Date |
27/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreEngagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Engagement of consultant for preparation of bankable dpr and tender document for proposed telemix chairlift from gulmarg to kongdori (imported) as per cen standard.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreSupply, installation, testing and commissioning of table-top afm/stm system for ambient operation with vibration isolation stage and advanced imaging options
Supply,&#x0d installation, testing and commissioning of table-top afm/stm system for ambient operation with&#x0d vibration isolation stage and advanced imaging options at the department of physics, kannur university (under pm usha scheme)
Read moreSpecial repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) meerut cantt
Special repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) 
 meerut cantt
Read moreAAAAAAAAAA
Login to viewJagatpur road from 0.40 k.m. to 1.184 k.m., widening strengthening under barasat highway division no. - i in the&#x0d district of north 24 parganas (2nd call)
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreof your Industry type