Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Mpm Unit Ii Mill 2 A To 2 J Overhauling Of Hot Air Gates Hot Air Dampers
|
| Description |
Nctps Ii Mi Circle Mpm Unit Ii Mill 2 A To 2 J Overhauling Of Hot Air Gates Hot Air Dampers
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_455830_1 |
|
Reference Number |
SE MI NCTPS II O M 89 24 25 |
| Tender Fee | 0 |
| EMD | 7300 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=542123 |
| Start Date | June 20, 2024 15:30 |
| End Date |
Expired
27/06/2024
Expired 838 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during aoh 2026 27
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Read moreNctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreProcurement of spares of coal mill hot air dampers and cold air dampers installed in phase-i at 2x600mw at sstpp, mppgcl, dongalia
Procurement of spares of coal mill hot air dampers and cold air dampers installed in phase-i at 2x600mw at sstpp, mppgcl, dongalia
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 113 26 27
Nctps i semi circle aoh 2627 tm dn unit i iii dismantling of unit 1 turbine bearing pedestal cover no4 unit 3 turbine bearing cover no2 inspection machining of oil guard sealing rings checking the jack oil hoses and replacement of damaged hoses if an
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 114 26 27
Nctps i semi circle aoh 26 27 tm dn unit i axial shift rectification dismantling, inspection and replacement of thrust bearing pads and correcting the axial float of the turbine during aoh for the year 202627
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 26 27 specification no 115 26 27
Nctps i semi circle aoh 2627bm dn unit i renewal of damaged acw line at 0mtr from boiler wall to mill area during annual overhaul 202627
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreTtps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Ttps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreof your Industry type