Tender Details

About Tender

🏗️ Construction Opportunity With Eastern Coalfields Limited 🏗️ Eastern Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Construction Of A Reinforced Cement Concrete (R.C.C.) Side Wall Beneath The Grand Chord Line At B.P.Seam Of Lakhimata Colliery. 🛠️ 📍 Location: Mugma Area Bid Submission Deadline: 25th May 2024, 5:00 Pm Emd: Inr 20,900 Interested Contractors Must Submit Detailed Bids, Including Technical Specifications, Method Statements, And Financial Bids, By The Stipulated Deadline. This Project Involves The Construction Of A 0.30m Thick R.C.C. Side Wall, A Critical Component Of The Mining Infrastructure. Keywords: Construction, R.C.C. Side Wall, Eastern Coalfields Limited, Psu, Lakhimata Colliery, B.P.Seam, Tender, Bid Submission, Mugma Area
Particulars Details
Title
Construction Of R.C.C. (0.30m Thick) Side Wall Beneath Grand Chord Line At B.P.Seam Of Lakhimata Colliery.
Description
Construction Of R.C.C. (0.30m Thick) Side Wall Beneath Grand Chord Line At B.P.Seam Of Lakhimata Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_307719_1
Reference
Number
ECL/GM/MA/SRV/ 24-25/892/E-05 Date.07.05.2024
Tender Fee 0
EMD 20900
Tender Value -
Place ECL, MUGMA AREA.
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318870

Start Date May 15, 2024 19:30
End Date
Expired 25/05/2024

Expired 870 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 10 (ten) nos. of brick pillar for roof support at b.p.seam of lakhimata colliery.

Construction of 10 (ten) nos. of brick pillar for roof support at b.p.seam of lakhimata colliery.

Read more
Construction of 3(three) nos of sectionalisation stopping in b.p.seam panel b-1 of lakhimata colliery.

Construction of 3(three) nos of sectionalisation stopping in b.p.seam panel b-1 of lakhimata colliery.

Read more
Construction of 10 nos r.c.c pillars at b.p.seam (bottom section) of khoodia colliery.

Construction of 10 nos r.c.c pillars at b.p.seam (bottom section) of khoodia colliery.

Read more
Dewatering of b.p.seam with round 0 clock operation and maintenance, as and when needed, for a period of maximum 60 days at lakhimata colliery.

Dewatering of b.p.seam with round 0 clock operation and maintenance, as and when needed, for a period of maximum 60 days at lakhimata colliery.

Read more
Filling of pond and making brick drain on west side of es incline at lakhimata colliery under lakhimata group of mines.

Filling of pond and making brick drain on west side of es incline at lakhimata colliery under lakhimata group of mines.

Read more
Extension of rcc drain from back side of dhawrah to existing drain b.p.i coal depot of lakhimata colliery under lakhimata group of mines.

Extension of rcc drain from back side of dhawrah to existing drain b.p.i coal depot of lakhimata colliery under lakhimata group of mines.

Read more
Construction of r.c.c. drain at upper side of 31 no. incline under badjna colliery.

Construction of r.c.c. drain at upper side of 31 no. incline under badjna colliery.

Read more
Construction of rcc pucca drain of approx 198.00 meter length towards north side of under pass railway culvert for diverting surface water of lakhimata side near 2 and 7 no incline at shampur-b colliery.

Construction of rcc pucca drain of approx 198.00 meter length towards north side of under pass railway culvert for diverting surface water of lakhimata side near 2 and 7 no incline at shampur-b colliery.

Read more
Construction of 13 nos. 0.50m thick isolation stopping and side wall in outbye side of the isolation stopping for proposed panel-21 (bottom section) in kenda seam at jambad ug colliery

Construction of 13 nos. 0.50m thick isolation stopping and side wall in outbye side of the isolation stopping for proposed panel-21 (bottom section) in kenda seam at jambad ug colliery

Read more
Construction of 03 (three) numbers 1.0m thick sectionalisation stopping to sectionalize the south east side unused developed area in kenda seam of jambad ug colliery

Construction of 03 (three) numbers 1.0m thick sectionalisation stopping to sectionalize the south east side unused developed area in kenda seam of jambad ug colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise