Tender Details

About Tender

🏗️ Invitation For Bids: Dismantling And Construction Of Cc Road 🛣️ The Vice Chairman Of Mussoorie Dehradun Development Authority, A State Government Entity, Invites Bids For The Dismantling And Construction Of A Continuous Concrete (Cc) Road At Rest Camp Ward No. 80, From Suman Bhattiya House To Gourav Nishad House In Dehradun. 📅 Bid Submission Deadline: July 11, 2024, 1:00 Pm Tender Fee: Inr 1770 Emd: Inr 46000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Mussoorie Dehradun Development Authority, Road Construction, Continuous Concrete Road, Infrastructure Project, Government Tender, Bid, Dehradun
Particulars Details
Title
Dismentaling And Construction Of Cc Road At Rest Camp Ward No 80 From Suman Bhatiya House To Gourav Nishad House , Dehradun
Description
Dismentaling And Construction Of Cc Road At Rest Camp Ward No 80 From Suman Bhatiya House To Gourav Nishad House , Dehradun
Organisation Vice Chairman Mussoorie Dehradun Development Authority Dehradun | State Govt. and UT
Tender Id 2024_MDDA_73139_1
Reference
Number
MDDA/CIVIL/220/128/2024-25
Tender Fee 1770
EMD 46000
Tender Value
Place DEHRADUN
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87671
Start Date July 05, 2024 15:30
End Date

18/07/2024 ( Expired 305 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Construction of boundary wall and paver block work ganesh garden shyampur road ward no 22

Construction of boundary wall and paver block work ganesh garden shyampur road ward no 22

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
It addl. pune infotech park i industrial

Construction of 6 lane road using cement&amp#x0d concrete treatment with footpath and storm water pipeline&amp#x0d repairing and providing new curbing at center verge and&amp#x0d road furnitures from shivaji chowk to smashan bhumi&amp#x0d

Read more
Construction of mrf center and windrow platform at ward no 12 trenching ground under sbm 2.0

Construction of mrf center and windrow platform at ward no 12 trenching ground under sbm 2.0

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise