Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Execution Testing Commissioning Of Cluster Distribution System Of Tehsils Chhabra, Chhipabarod, Atru Of Distt Baran And 10 Years O And M, Parwan Pkg 4
|
Description |
Execution Testing Commissioning Of Cluster Distribution System Of Tehsils Chhabra, Chhipabarod, Atru Of Distt Baran And 10 Years O And M, Parwan Pkg 4
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2024_PHCJA_429329_1 |
Reference Number |
ACE JHA NIT No. 02/2024-25 |
Tender Fee | 52500 |
EMD | 10.09 Crore |
Tender Value | |
Place | Baran |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=772122 |
Start Date | October 28, 2024 15:30 |
End Date |
04/12/2024 ( Expired 212 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by disc filter system for 5.6 mld capacity stp at baga including comprehensive o and m for 3 years
Read moreDesign, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Design, construction, supply, erection, testing and commissioning of tertiary treatment by sand and carbon filter system for 2 mld capacity stp at patto including comprehensive o and m for 3 years
Read moreDesign, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.
Design, supply, construction, testing, trial and commissioning of 10 kld,15 kld,20 kld,25 kld and 35 kld fstps towards faecal sludge and septage management (fssm) with 10 years operation and maintenance.
Read moreInstallation, testing and commissioning of 11 kv line, distribution transformer, lt line and providing household connection to identified households in the o and m circle
Installation, testing&#x0d and commissioning of 11 kv line, distribution transformer, lt line and providing household connection to identified&#x0d households in the o and m circle
Read moreInstallation, testing and commissioning of 11 kv line, distribution transformer, lt line and providing household connection to identified households in the jhabua district o and m circle jhabua
Installation, testing and commissioning of 11&#x0d kv line, distribution transformer, lt line and&#x0d providing household connection to identified&#x0d households in the jhabua district o and m circle&#x0d jhabua
Read moreExecution of 4 nos. lis with intake points on kharsua river , brahmani river including its dist. network upto 1 ha chak having planned cca 5950 ha in cluster-xxxvii including power system connectivity and o and m for 15 years on epc turnkey mode
Megalift projects
Read moreTender for selection of epc contractor system integrator for design, supply, installation, testing , commissioning including 3 years of non-comprehensive operation and maintenance of 125kwp rooftop solar pv project at tidel park coimbatore
Tender for selection of epc contractor system integrator for design, supply, installation, testing , commissioning including 3 years of non-comprehensive operation and maintenance of 125kwp rooftop solar pv project at tidel park coimbatore
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreof your Industry type