Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Damaged Portion Of Compound Wall, Dismantling Of Dilapidated Walls Of Engine Room And Other Connected Civil Works In Telephone Exchange Compound At Manthani, Karimnagar Oa
|
| Description |
Construction Of Damaged Portion Of Compound Wall, Dismantling Of Dilapidated Walls Of Engine Room And Other Connected Civil Works In Telephone Exchange Compound At Manthani, Karimnagar Oa
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2025_BSNL_238916_1 |
|
Reference Number |
NIT No. 79/NIT/CECSTSCZ/HYD/2025 |
| Tender Fee | 590 |
| EMD | 9300 |
| Tender Value | - |
| Place | Manthani Karimnagar |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=271595 |
| Start Date | June 19, 2025 23:05 |
| End Date |
Expired
27/06/2025
Expired 478 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of fallen portion of compound wall in the telephone exchange compound at vemulawada in karimnagar oa
Construction of fallen portion of compound wall in the telephone exchange compound at vemulawada in karimnagar oa
Read moreProviding and fixing chain link mesh fencing in the fallen portion of compound wall in the telephone exchange compound at jammikunta in karimnagar oa
Providing and fixing chain link mesh fencing in the fallen portion of compound wall in the telephone exchange compound at jammikunta in karimnagar oa
Read moreProviding and laying drainage pipes, construction of fallen portion of compound wall and other miscellaneous civil works in telephone exchange compound at godhavarikani, karimnagar oa
Providing and laying drainage pipes, construction of fallen portion of compound wall and other miscellaneous civil works in telephone exchange compound at godhavarikani, karimnagar oa
Read moreConstruction of fallen portion of compound wall in the telephone exchange compound at geesukonda in warangal oa
Construction of fallen portion of compound wall in the telephone exchange compound at geesukonda in warangal oa
Read moreProviding foundation and erection of shelter at kolanoor telephone exchange site, including dismantling and shifting of shelter from garrepally te, karimnagar oa
Providing foundation and erection of shelter at kolanoor telephone exchange site, including dismantling and shifting of shelter from garrepally te, karimnagar oa
Read moreDismantling 3 nos x 9m roof top poles from terrace of meenakshi towers building metpalli and shifting of tower materials to metpalli telephone exchange in karimnagar oa
Dismantling 3 nos x 9m roof top poles from terrace of meenakshi towers building metpalli and shifting of tower materials to metpalli telephone exchange in karimnagar oa
Read moreMiscellaneous civil works in bsnl mw telephone exchange compound fataha mirzapur oa under ba varanasi
Miscellaneous civil works in bsnl mw telephone exchange compound fataha mirzapur oa under ba varanasi
Read moreReconstruction of part front boundary wall of telephone exchange compound at ahmedgarh under sangrur oa
Reconstruction of part front boundary wall of telephone exchange compound at ahmedgarh under sangrur oa
Read moreof your Industry type