Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Units I To Iv Attending The Preventive Breakdown Maintenance Works Of Valves Pipe Lines Reducers By Cutting Welding Gasket Renewing Of Valves Flanges And Overhauling Of Defective Passing Valves In Units I To Iv During 2023 24
|
| Description |
Mtps I Tm Units I To Iv Attending The Preventive Breakdown Maintenance Works Of Valves Pipe Lines Reducers By Cutting Welding Gasket Renewing Of Valves Flanges And Overhauling Of Defective Passing Valves In Units I To Iv During 2023 24
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_389476_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 337 / 2023-24 |
| Tender Fee | 0 |
| EMD | 7700 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | November 16, 2023 18:30 |
| End Date |
Expired
30/11/2023
Expired 1052 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreOperation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years
Operation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreMtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting and welding gasket renewing of valves flanges etc
Mtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting and welding gasket renewing of valves flanges etc
Read moreMtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line
Read moreMtps i bm units iii and iv boiler pressure parts preventive/breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism etc
Mtps i bm units iii and iv boiler pressure parts preventive/breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism etc
Read moreMtps i bm unit-iv boiler pressure parts aoh 2024 overhauling of hp lp valves and replacement of defective valves
Mtps i bm unit-iv boiler pressure parts aoh 2024 overhauling of hp lp valves and replacement of defective valves
Read moreMtps i bm unit iv boiler pressure parts aoh 2025 overhauling of hp lp valves and replacement of defective valves
Mtps i bm unit iv boiler pressure parts aoh 2025 overhauling of hp lp valves and replacement of defective valves
Read moreMtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Mtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Read moreof your Industry type