Mtps I Tm Units I To Iv Attending The Preventive Breakdown Maintenance Works Of Valves Pipe Lines Reducers By Cutting Welding Gasket Renewing Of Valves Flanges And Overhauling Of Defective Passing Valves In Units I To Iv During 2023 24
Description
Mtps I Tm Units I To Iv Attending The Preventive Breakdown Maintenance Works Of Valves Pipe Lines Reducers By Cutting Welding Gasket Renewing Of Valves Flanges And Overhauling Of Defective Passing Valves In Units I To Iv During 2023 24
Organisation Government of Tamil Nadu
Tender Id 2023_EB_389476_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT. 337 / 2023-24
Tender Fee 0
EMD 7700
Tender Value -
Place Office of the Superintending Engineer /M-I/MTPS-I
Link
View Original Tender Notice

https://tntenders.gov.in

Start Date November 16, 2023 18:30
End Date
Expired 30/11/2023

Expired 1052 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Read more
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Read more
Operation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years

Operation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Mtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting and welding gasket renewing of valves flanges etc

Mtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting and welding gasket renewing of valves flanges etc

Read more
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Read more
Mtps i bm units iii and iv boiler pressure parts preventive/breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism etc

Mtps i bm units iii and iv boiler pressure parts preventive/breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism etc

Read more
Mtps i bm unit-iv boiler pressure parts aoh 2024 overhauling of hp lp valves and replacement of defective valves

Mtps i bm unit-iv boiler pressure parts aoh 2024 overhauling of hp lp valves and replacement of defective valves

Read more
Mtps i bm unit iv boiler pressure parts aoh 2025 overhauling of hp lp valves and replacement of defective valves

Mtps i bm unit iv boiler pressure parts aoh 2025 overhauling of hp lp valves and replacement of defective valves

Read more
Mtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25

Mtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25