Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Goods Siding Extension At Kitham Station 🛤️📜 The Ministry Of Railways, Specifically The North Central Railway, Invites Bids From Eligible Contractors For The Provision Of A Full Length Goods Siding By Extending The Existing A&D Siding At Kitham Station, Agra Division. 📅 Bid Submission Deadline: June 25, 2024, 3:00 Pm A Tender Fee Of Inr 145200 Is Applicable As Earnest Money Deposit (Emd). Interested Bidders Must Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Railway Siding, Infrastructure Development, North Central Railway, Ministry Of Railways, Tender, Bid Submission, Kitham Station, Agra Division| Particulars | Details |
|---|---|
| Title |
Provision Of Full Length Goods Siding By Extending A&Amp D Siding At Kitham Station Of Agra Division Of North Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75433315 |
|
Reference Number |
DYCE-GS-AGC-2024-06 |
| Tender Fee | 0 |
| EMD | 1.45 Lakh |
| Tender Value | - |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75433315/viewNitPdf_4590485.pdf |
| Start Date | June 01, 2024 17:00 |
| End Date |
Expired
25/06/2024
Expired 844 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.
Construction of railway formation including blanketing material, side drain & other miscellaneous work for construction of full-length stabling lines by extending existing short-length track machine siding in tangarbansali station yard (tgb) under jurisdiction of sr den south of ranchi division.
Read moreSupply, erection,testing and commissioning of 25kv, ac ohe modification work in connection with provision of rail level additional full length goods handling line at taloja panchanand goods shed in mumbai division of central railway
Supply, erection,testing and commissioning of 25kv, ac ohe modification work in connection with provision of rail level additional full length goods handling line at taloja panchanand goods shed in mumbai division of central railway
Read moreElectrical trd work in connection with provision of new additional high-level full-length platform no. 2 at kiroda station of ju division.
Electrical trd work in connection with provision of new additional high-level full-length platform no. 2 at kiroda station of ju division.
Read moreS&t work in connection with - provision of full length pf shelter at ajmer station (nsg-2) on pf-6 of ajmer division nwr.
S&t work in connection with - provision of full length pf shelter at ajmer station (nsg-2) on pf-6 of ajmer division nwr.
Read moreWidening and strengthening of coal transportation road from railway siding to kanchan ocm (length 12.10 km) at nowrozabad sub-area, johilla area including 05 (five) years comprehensive maintenance
Widening and strengthening of coal transportation road from railway siding to kanchan ocm (length 12.10 km) at nowrozabad sub-area, johilla area including 05 (five) years comprehensive maintenance
Read moreOhe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Read morePanp & s - provision of general waiting room at pf-1, toilet block at pf-2, full length pf shelter at pf-1&2 at panp & waiting room and parking development at s.
Panp & s - provision of general waiting room at pf-1, toilet block at pf-2, full length pf shelter at pf-1&2 at panp & waiting room and parking development at s.
Read moreHeavy repairs and rehabilitation of metro railway tunnel from km 13.000 to km 16.250 (thorough) at south section and km 3.700 to km 7.700 (in patches for most dilapidated portion) at north section, for total length of 4.800 km of metro railway, kolkata.
Heavy repairs and rehabilitation of metro railway tunnel from km 13.000 to km 16.250 (thorough) at south section and km 3.700 to km 7.700 (in patches for most dilapidated portion) at north section, for total length of 4.800 km of metro railway, kolkata.
Read moreCivil engineering works, electrification works and signalling & telecommunication works of new single broad gauge line of bansgaon(excluding)(chainage 76+000) -barhalganj (including) (chainage43+060) section (length: 32.940 km) in connection with sahjanwa - dohrighat new broad gauge railway line project of north eastern railway
Civil engineering works, electrification works and signalling & telecommunication works of new single broad gauge line of bansgaon(excluding)(chainage 76+000) -barhalganj (including) (chainage43+060) section (length: 32.940 km) in connection with sahjanwa - dohrighat new broad gauge railway line project of north eastern railway
Read moreConstruction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Read moreof your Industry type