Tender Details

Particulars Details
Title
Mtc. Of Road From Nh 08 To Nh 08 Via Zaithang Thangnang And Ujan Thangnang Ch.2.50 Km To 4.50 Km (L 2.00 Km) Under 58 Panisagar A/C During The Year 2025 26
Description
Patch Wbm Grouting Re Carpeting And Seal Coating Etc. Gr.Ii.
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1000
EMD 43076
Tender Value
Place Panisagar
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 21:30
End Date

23/07/2025 ( 11 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more

Improvement from km167/600 to 187/600 of nh85 (old nh-49e) (kochi -madurai-thondi road) on (epc) basis contract under annual plan 2025-26 in the state of tamilnadu

Read more
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)

Read more
Widening and strengthening of road from holiday home to boriyo (chirondi) via bitha, edalhatu (total length-3.162 km) for the year 2025-26.

Widening and strengthening of road from holiday home to boriyo (chirondi) via bitha, edalhatu (total length-3.162 km) for the year 2025-26.

Read more
Short term maintenance contract works of nh-215 (trans arunachal highway) through stmc from ch. 14.600 km (disang bridge) to ch. 63.400 km (barbaruah) ( length 48.800) under pwd dibrugarh nh division in the state of assam for the year 2025-26

Short term maintenance contract works of nh-215 (trans arunachal highway) through stmc from ch. 14.600 km (disang bridge) to ch. 63.400 km (barbaruah) ( length 48.800) under pwd dibrugarh nh division in the state of assam for the year 2025-26

Read more
Maintenance of agartala town road during the year 2025 26 road portion from bodhjung school chowmuhani to womens college trijunction sh plastic modified bituminous concrete and road furniture works

Maintenance of agartala town road during the year 2025 26 road portion from bodhjung school chowmuhani to womens college trijunction sh plastic modified bituminous concrete and road furniture works

Read more
Maintenance of agartala town road during the year 2025 26 road portion from i fire brigade chowmuhani to battala and ii battala to melarmath sh bituminous concrete and road furniture works

Maintenance of agartala town road during the year 2025 26 road portion from i fire brigade chowmuhani to battala and ii battala to melarmath sh bituminous concrete and road furniture works

Read more
Maintenance of agartala town road during the year 2025 26 road portion from i astabal bridge to northgate, ii north gate to haradhan sangha and iii north gate to bhagaban thakur chowmuhani sh bituminous concrete and road furniture works

Maintenance of agartala town road during the year 2025 26 road portion from i astabal bridge to northgate, ii north gate to haradhan sangha and iii north gate to bhagaban thakur chowmuhani sh bituminous concrete and road furniture works

Read more
Mtc. of road from bahtifatiqchera(nh108b) to hriday para during the year 2025-26/sh potholes repair, patch wbm, recarpeting with allied works etc.(l-0.53km)

Mtc. of road from bahtifatiqchera(nh108b) to hriday para during the year 2025-26/sh potholes repair, patch wbm, recarpeting with allied works etc.(l-0.53km)

Read more
Mtc. of road from nh 108b(fatikcherra) to house of sudip debnath during the year 2025-26/sh flat brick soling, wbm-3, pmc seal coat (l-0.56km)(ch.0.00 to 0.56km)

Mtc. of road from nh 108b(fatikcherra) to house of sudip debnath during the year 2025-26/sh flat brick soling, wbm-3, pmc seal coat (l-0.56km)(ch.0.00 to 0.56km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise