Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road From University Road To Shabaza Mohalla Via Shimblival Panihad ( Phase 1st ) By Way Of Earth Work In Cutting/Filling, Construction Of R/B Walls, Pl Of 150 Mm Thick Gsb, 06 No Hume Pipe Culvert In Km 1st Rd 0 To 1000. Length 1
|
Description |
Construction Of Road From University Road To Shabaza Mohalla Via Shimblival Panihad ( Phase 1st ) By Way Of Earth Work In Cutting/Filling, Construction Of R/B Walls, Pl Of 150 Mm Thick Gsb, 06 No Hume Pipe Culvert In Km 1st Rd 0 To 1000. Length 1
|
Organisation | Government of Jammu and Kashmir |
Tender Id | 2023_PWDJK_232483_4 |
Reference Number |
e-NIT No 02 of 2023-24 Dated 07.10.2023 |
Tender Fee | 1500 |
EMD | 1.07 Lakh |
Tender Value | |
Place | Kotranka |
Link | https://jktenders.gov.in |
Start Date | October 08, 2023 14:30 |
End Date |
17/10/2023 ( Expired 575 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc
Balance work for construction of road from kaloon to haji shark harayala via dharana, mendhar by way of earth work in cutting, cross drainage, walling , providing and laying of 150mm thick wbm grade-ii,75mm thick wbm grade-iii and 25 mm thick ogpc
Read moreDevelopment of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Read moreMtc. of shasan tilla to pig firm road via colony under jampui hill sub-division, pwd(rnb) during the year 2025-2026 sh- rcc box culvert, earth cutting, construction of embankment, brick soling etc.
Mtc. of shasan tilla to pig firm road via colony under jampui hill sub-division, pwd(rnb) during the year 2025-2026 sh- rcc box culvert, earth cutting, construction of embankment, brick soling etc.
Read moreBalance work for construction of bridge approach on sailian to mahara road on km 1st rd 100-150 , package no. jk11-138, stage ist, block surankote, phase x, district poonch length-5.00 kms.
Balance work for construction of bridge approach on sailian to mahara road on km 1st rd 100-150 , package no. jk11-138, stage ist, block surankote, phase x, district poonch length-5.00 kms.
Read moreConstruction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp
Construction of link road from rail to bassa km 0/0 to 1/600 (sh formation curring 5/7 mtr wide c/o r/wall and 900mm dia hume pipe culvert at rd 0/180 0/255 and 0/345) under otmnp
Read moreConstruction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Construction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Read moreConstruction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Balance work for construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Read moreConstruction of cross-drainage work along with hume pipe culvert near rd-152m (rd-0 end of ph road) in left bank play ground area side of teesta-v power station, balutar
Construction of cross-drainage work along with hume pipe culvert near rd-152m (rd-0 end of ph road) in left bank play ground area side of teesta-v power station, balutar
Read moreConstruction of road and pulli from main road towards house of verma and others (sh - providing laying hume pipe culvert (900 mm dia) at rd 0/095, c/o r/wall km 0/030 to 0/034, u-shape drain 0/00 to 0/020 and b/wll at rd 0/060 to 0/065 (mmgsy)
Construction of road and pulli from main road towards house of verma and others (sh - providing laying hume pipe culvert (900 mm dia) at rd 0/095, c/o r/wall km 0/030 to 0/034, u-shape drain 0/00 to 0/020 and b/wll at rd 0/060 to 0/065 (mmgsy)
Read moreConst and mt link road from panjoa to kuthiari road km 000 to 0981 sh const of 900mm dia rcc hume pipe culvert at rd 0840 and pl gsb wmm and tarring between km 0345 to 0981 under mmgsy
Const and mt link road from panjoa to kuthiari road km 000 to 0981 sh const of 900mm dia rcc hume pipe culvert at rd 0840 and pl gsb wmm and tarring between km 0345 to 0981 under mmgsy
Read moreof your Industry type