Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation Of Kutcha Drain To Pucca Drain Along The Eastern Peripheral Wall Of Ktps Phase I
|
| Description |
Upgradation Of Kutcha Drain To Pucca Drain Along The Eastern Peripheral Wall Of Ktps Phase I
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_WBPDC_551676_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E2636/23-24 |
| Tender Fee | 0 |
| EMD | 99746 |
| Tender Value | |
| Place | KTPS, Mecheda |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 09, 2023 16:30 |
| End Date |
Expired
28/08/2023
Expired 1023 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ddition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Addition / alteration/ upgration of perimeter wall and main drain along with allied facilities at sspl under ge(i) r and d delhi
Read moreUpgradation to non-residential area of nizam palace, kolkata, during-2026-27. sh: repair and fixing of sewer lines at the rear side of the 1st mso building (parking area) up to the front of the old type-i quarters, and in front of the old nizam palace (beside road), in various other areas of the nizam palace complex, kolkata.
Read moreRepairs to drain boundary wall fencing gates culvert etc in zone c area under age br (n) no i of ge (n) secunderabad
Repairs to drain boundary wall fencing gates culvert etc in zone c area under age br (n) no i of ge (n) secunderabad
Read moreCutting of excess earth (ti...
Cutting of excess earth (tibba) along the bank of siwana majra from 2200 to 3800-l
Read moreUnder the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Under the chief minister urban infrastructure development scheme (fourth phase) announced by the state government, construction of cc road and rcc drain in ward no. 08 as per the approval of additional construction works.
Read moreLaying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.
Laying of ofc from gail terminals in rcf trombay to gail terminals in mgl wadala along the existing pipeline.
Read moreDhule/dmc/ ld/pwdfund/46 /1-1/2026-27 relocation of high tension (ht) electricity poles and distribution transformer centers (dtcs) along the main road from the gurudwara to the chhatrapati shivaji maharaj statue in the city area, dhule
Relocation of high tension (ht) electricity poles and distribution transformer centers (dtcs) along the main road from the gurudwara to the chhatrapati shivaji maharaj statue in the city area, dhule
Read morePitc of led bollard light along the newly constructed connecting path from officer mess to vip hut at stc bsf chakur
Pitc of led bollard light along the newly constructed connecting path from officer mess to vip hut at stc bsf chakur
Read moreConstruction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreof your Industry type