Tender Details

Particulars Details
Title
Clearing The Debris, Garbage, Ash And Other Wastes Etc., In Unit 4 And 5 And Allied Areas For The Period From 01.04.2024 To 31.03.2025
Description
Clearing The Debris, Garbage, Ash And Other Wastes Etc., In Unit 4 And 5 And Allied Areas For The Period From 01.04.2024 To 31.03.2025
Organisation Government of Tamil Nadu
Tender Id 2024_EB_405971_1
Reference
Number
Spec.No.CE SE CIVIL TTPS 19 2024 2025
Tender Fee 0
EMD 7800
Tender Value
Place Office of the SE Civil TTPS TTN 4
Link https://tntenders.gov.in
Start Date January 04, 2024 23:30
End Date

20/01/2024 ( Expired 528 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Up-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot

Up-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot

Read more
Construction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)

Construction of 4 new foot over bridges in&amp#x0d indore on design, built, operate and transfer&amp#x0d basis and maintenance of existing three fobs&amp#x0d for license period of 10 years (extendable to&amp#x0d five years)

Read more
Special repair of various link roads falling under mc nabha group no. 8 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Special repair of various link roads falling under mc nabha group no. 8 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Read more
Special repair of various link roads falling under mc nabha group no. 1 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Special repair of various link roads falling under mc nabha group no. 1 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Read more
Special repair of link road nabha malerkotla road to todarwal l-7.83 km mc nabha under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Special repair of link road nabha malerkotla road to todarwal l-7.83 km mc nabha under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise