Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Clearing The Debris, Garbage, Ash And Other Wastes Etc., In Unit 4 And 5 And Allied Areas For The Period From 01.04.2024 To 31.03.2025
|
Description |
Clearing The Debris, Garbage, Ash And Other Wastes Etc., In Unit 4 And 5 And Allied Areas For The Period From 01.04.2024 To 31.03.2025
|
Organisation | Government of Tamil Nadu |
Tender Id | 2024_EB_405971_1 |
Reference Number |
Spec.No.CE SE CIVIL TTPS 19 2024 2025 |
Tender Fee | 0 |
EMD | 7800 |
Tender Value | |
Place | Office of the SE Civil TTPS TTN 4 |
Link | https://tntenders.gov.in |
Start Date | January 04, 2024 23:30 |
End Date |
20/01/2024 ( Expired 528 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreUp-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot
Up-gradation of dinanagar gharota road km 0.00 to 10.68 km including maintenance of road for 5 years (one year defect liability period and four years maintenance period) in distt. pathankot
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreSpecial repair of various link roads falling under mc nabha group no. 8 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Special repair of various link roads falling under mc nabha group no. 8 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Read moreSpecial repair of various link roads falling under mc nabha group no. 1 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Special repair of various link roads falling under mc nabha group no. 1 under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Read moreSpecial repair of link road nabha malerkotla road to todarwal l-7.83 km mc nabha under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Special repair of link road nabha malerkotla road to todarwal l-7.83 km mc nabha under s/r scheme 2022-23, 2023-24 and 2024-25 in distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th maintenance)
Read moreof your Industry type