Tender Details
Particulars | Details |
---|---|
Title |
Upgradation Of Transformer At Ziyarat Sharief From 100 Kva To 200 Kva (Level 2) And Ht Poles Also Shifting The Current/ Existing 100 Kva To Reshi Mohalla And Poles At Chountwaliwar C
|
Description |
Upgradation Of Transformer At Ziyarat Sharief From 100 Kva To 200 Kva (Level 2) And Ht Poles Also Shifting The Current/ Existing 100 Kva To Reshi Mohalla And Poles At Chountwaliwar C
|
Organisation | DC-PDD | State Govt. and UT |
Tender Id | 2024_PDD_261270_1 |
Reference Number |
EDG/V/088 OF 2024-25 |
Tender Fee | 200 |
EMD | 9500 |
Tender Value | |
Place | GANDERBAL |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=785184 |
Start Date | October 19, 2024 21:30 |
End Date |
07/11/2024 ( Expired 165 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Augmentation of 132kv substation laksar from 3x40 mva transformer to 2x40 mva and 1x80 mva transformer at 132kv voltage level
Augmentation of 132kv substation laksar from 3x40 mva transformer to 2x40 mva and 1x80 mva transformer at 132kv voltage level
Read moreRefurbishment, up gradation, developmen operation and maintenance of the existing hospital at v o c port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Development, operation and maintenance of the existing hospital at v o c port tuticorin to a 100 bedded super speciality hospital on dbfot
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreSurvey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Read moreInstallation of 2 nos 100 kva and 3 nos 200 kva transformer at different ward
Installation of 2 nos 100 kva and 3 nos 200 kva transformer at different ward
Read more100 kva. transformer and 11 kv. line shifting work (form mandi gate no. 02 to approach road ganesh mandir) at mandi yard shamshabad.
100 kva. transformer and 11 kv. line shifting work (form mandi gate no. 02 to approach road ganesh mandir) at mandi yard shamshabad.
Read moreShifting and itc of existing split ac units to iq sanjay place, agra and shifting and itc of 62.5 kva e/a from t.e. belanganj, agra to t.e. nai basti, firozabad oa agra.
Shifting and itc of existing split ac units to iq sanjay place, agra and shifting and itc of 62.5 kva e/a from t.e. belanganj, agra to t.e. nai basti, firozabad oa agra.
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreRevival and re-conditioning of street lighting from zero point to weighbridges no-6 with strengthing of poles at amrapali ocp under a-c area
Revival and re-conditioning of street lighting from zero point to weighbridges no-6 with strengthing of poles at amrapali ocp under a-c area
Read moreErection and dismantling of poles due to shifting of high wall machine from t3 trench to t2 trench for a period of 06 months at sharda ocm of sohagpur area secl
Erection and dismantling of poles due to shifting of high wall machine from t3 trench to t2 trench for a period of 06 months at sharda ocm of sohagpur area secl
Read moreof your Industry type