Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preparation Of Detailed Project Report/Dnit Alongwith Supervision During Execution For Ex Situ Treatment Of Manganese And Arsenic At 3 Ranney Wells (30 Mld) In Faridabad, Haryana As Per Water Quality Analysis Carried Out For Treatment Etc
|
| Description |
Preparation Of Detailed Project Report/Dnit Alongwith Supervision During Execution For Ex Situ Treatment Of Manganese And Arsenic At 3 Ranney Wells (30 Mld) In Faridabad, Haryana As Per Water Quality Analysis Carried Out For Treatment Etc
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2026_HRY_513680_1 |
|
Reference Number |
2026AC85FBA9 AE02 4525 A0FD A87948D2B4791851002 |
| Tender Fee | 2180 |
| EMD | 50000 |
| Tender Value | - |
| Place | BADSHAHPUR |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592502 |
| Start Date | April 08, 2026 21:00 |
| End Date |
Expired
13/04/2026
Expired 185 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Augmentation of water supply scheme faridabad design, construction, erection and commissioning of 05 ranney wells (radial collector wells of 10 mld capacity each), 01 main boosting station including purchase of land in revenue estate
Of village basantpur and surrounding area along the flood plains of yamuna river district faridabad including 3 months trial run period and thereafter 05 year o and m with dlp and all other work contingent thereto on epc basis.
Read moreAugmentation of water supply scheme, faridabad- design, construction, erection and commissioning of 05 ranney wells (radial collector wells of 10 mld capacity each), 01 main boosting station including purchase of land in revenue estate etc.
Design, construction, erection and commissioning of 05 ranney wells (radial collector wells of 10 mld capacity each), 01 main boosting station including purchase of land in revenue estate etc.
Read moreOperation/maintenance of 1.5 mld capacity sewage treatment plant at rha bazar, ambala cantt. as per dnit.
As per the tender
Read moreOperation/maintenance of 1.5 mld capacity sewage treatment plant at rha bazar, ambala cantt as per dnit.
As per the tender
Read moreOperation/maintenance of 1.5 mld capacity sewage treatment plant at rha bazar, ambala cantt as per dnit.
As per the tender document
Read moreOperation/maintenance of 1.5 mld capacity sewage treatment plant at rha bazar, ambala cantt. as per dnit.
As per the tender
Read moreRehabilitation or modification works to be carried out in the existing 3 mld 2 mld sewage treatment plants of tansidco, industrial estate at ambattur including replacement of mechanical, electrical and instrumentation, laboratory equipment
Rehabilitation or modification works to be carried out in the existing 3 mld 2 mld sewage treatment plants of tansidco, industrial estate at ambattur including replacement of mechanical, electrical and instrumentation, laboratory equipment
Read moreDnit for operation and maintenance of sewerage treatment plant of 14 mld capacity (mbbr technology) at mansa for 3 months period 01.01.2025 to 31.03.2025
Dnit for operation and maintenance of sewerage treatment plant of 14 mld capacity (mbbr technology) at mansa for 3 months period 01.01.2025 to 31.03.2025
Read moreDnit for operation and maintenance of sewerage treatment plant of 14 mld capacity (mbbr technology) at mansa for 3 months period 01.01.2025 to 31.03.2025
Dnit for operation and maintenance of sewerage treatment plant of 14 mld capacity (mbbr technology) at mansa for 3 months period 01.01.2025 to 31.03.2025
Read moreO and m of sewerage treatment plant of 8 mld capacity at zira for 10 months as per terms and conditions of approved dnit (10 months)
O and m of sewerage treatment plant of 8 mld capacity at zira for 10 months as per terms and conditions of approved dnit (10 months)
Read moreof your Industry type