Tender Details

Particulars Details
Title
Godavari Drinking Water Supply Scheme Phase Ii Iii Filling Of Osmansagar Himayatsagar Reservoirs With Godavari Water For Rejuvenation Of Musi River
Description
Ncb For Gdwss Ph Ii And Iii Filling Of Os And Hs Reservoirs With Godavari Water For Rejuvenation Of Musi River Manufacture, Supply, Lowering, Laying, Jointing, Testing And Commissioning Of 2200mm Ms P Main From Ghanpur To Osmansagar, 2400mm Ms P Main From Ghanpur To Muthangi, 3000mm Dia Ms Pipeline From Kokapet To Osmansagar Conduit Along Orr And 2200mm Dia Ms Pipeline For Interconnection Of Osmansagar And Himayathsagar Reservoirs, 3000mm Dia Ms P Main From Wtp To Mbr At Ghanpur, Construction Of 80 Ml Mbr, 18 Ml Rwr And Ph And Eme, Transfr, Substn At Ghanpur And 1500mm Dia Ms Main, Construction Of 120 Mld Wtp, 18 Ml Cwr, Ph With Eme, Substn, 1200mm Dia Ms Cwp Main At Osmansagar, 22.50 Ml Mbr At Golden Mile And 800/600/400mm Dia Distn Mains From Mbr Under Os And 1200mm Dia Ms Main, Construction Of 70 Mld Wtp, 18 Ml Cwr, Ph With Eme, Substn At Hs, 1000mm Dia Ms P Main To Budvel Reservoir Under Hs Reservoir Under Hybrid Annuity Mode Of Contract Including Mo M Of Project For 10 Years Package Ii
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 580778
Reference
Number
EP.No.03/ CGM(E) / PCC-II / Godavari Ph-IIIII/Package-II / Gpur to OSHS/2024-25, dated 07.03.2025
Tender Fee 29500
EMD 19.92 Crore
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date March 12, 2025 16:30
End Date

27/03/2025 ( Expired 24 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system

Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system

Read more
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Read more
Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme.session 2025-26

Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme at nagar palika parishad dhanpuri distt-shahdol (m.p.) session 2025-26

Read more
Water supply scheme for augmentation of uwss kota south, district kota including 05 years onm after 01 year of defect liability period under amrut 2.0

Water supply scheme for augmentation of uwss kota south, district kota including 05 years onm after 01 year of defect liability period under amrut 2.0

Read more
All in one bid for construction of 1 nos water detention structure at mrinalnagar wds, mouza-mrinalnagar , block-kakdwip ,gp-rabindra, jl no 28 , plot no 525 in the district of south 24 parganas under wbadmip -phase ii

All in one bid for construction of 1 nos water detention structure at mrinalnagar wds, mouza-mrinalnagar , block-kakdwip ,gp-rabindra, jl no 28 , plot no 525 in the district of south 24 parganas under wbadmip -phase ii

Read more
All in one bid for construction of 1 nos water detention structure at godkhali uttar wds, mouza-godkhali , block- basanti ,gp-masjidbati, jl no 144 , plot no 1368 in the district of south 24 parganas under wbadmip -phase ii

All in one bid for construction of 1 nos water detention structure at godkhali uttar wds, mouza-godkhali , block- basanti ,gp-masjidbati, jl no 144 , plot no 1368 in the district of south 24 parganas under wbadmip -phase ii

Read more
All in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii

All in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii

Read more
All in one bid for construction of 1 nos water detention structure at uttar durgapur dakshin wds, mouza-uttar durgapur , block- kakdwip ,gp-rabindra, jl no 26 , plot no 488 in the district of south 24 parganas under wbadmip -phase ii

All in one bid for construction of 1 nos water detention structure at uttar durgapur dakshin wds, mouza-uttar durgapur , block- kakdwip ,gp-rabindra, jl no 26 , plot no 488 in the district of south 24 parganas under wbadmip -phase ii

Read more
Designing and providing 24x7 drinking water supply in selected demonstration zones including water loss reduction (wlr), rehabilitation of existing distribution lines and house connections formation of dmas, providing consumer water meters,

Providing consumer water meters, instrumentation, scada and its allied works including operation for (24 months) during project implementation (construction phase) and operation and maintenance for a period of 2 years at ludhiana, punjab.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise