Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Junction Improvement On Shriram Bridge On Murbad Karjat Chouk Lohop Road, Sh 79 In Km 122/450, Tal. Karjat, Dist. Raigad.
|
Description |
Junction Improvement On Shriram Bridge On Murbad Karjat Chouk Lohop Road, Sh 79 In Km 122/450, Tal. Karjat, Dist. Raigad.
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2025_PWR_1180301_1 |
Reference Number |
Notice No. 07 for 2025-26 |
Tender Fee | 2860 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Panvel |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2049139 |
Start Date | May 15, 2025 18:30 |
End Date |
21/05/2025 ( Expired 38 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreConstruction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Read moreImprovement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Improvement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Read moreDesign and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang metaliang chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang-metaliang-chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreImprovement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km)
Improvement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km).
Read moreof your Industry type